is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, FLASHING ARROW SIGN, TEMP TRAFFIC STRIPE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMP CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE SWPPP, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP GRAVEL BAG BERM, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CLEAR & GRUB, ROADWAY EXCAVATION, HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, STEEL FLARED END SECTION, REMOVE CULVERT, REMOVE FLARED END SECTION, REMOVE PAVEMENT MARKER, PAVEMENT MARKERS, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE & RELOCATE SIGNS, ROADSIDE SIGNS, VEGETATION CONTROL, HIGH TENSION CABLE BARRIER, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, RUMBLE STRIP, TRAFFIC STRIPE TAPE WITH CONTRAST, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
Install Cable Median Barrier
01-0K3104
Caltrans
HWY 101 from 101/20 Separation to north State Street, Ukiah, CA, 95482
08-31-2023 at 02:00 PM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
PDF ATTACHMENTS: