Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control, Portable Radar Speed Feedback Sign, Temporary Barrier, PCMS, Alternative Temporary Crash Cushion, Water Pollution Control Plan, Temporary Erosion Control, Street Sweeping, Treated Wood Waste, Noise Monitoring, Clearing & Grubbing, Erosion Control, Hydroseed, AC Dike, Tack Coat, Adjust Utilities, Minor Concrete, Surveying, Misc. Iron & Steel, Delineators & Markers, Signs, Midwest Guardrail System, Handrailing, Transition Railing, Crash Cushion, Concrete Barrier & Transition, Striping, Electrical, Geotextile, Hazardous Off-Haul Lead Z-2, Cold Milling & Grinding, Vegetation Control, Concrete Demolition, Asphalt Oil and Trucking.


PROJECT NAME:

Construction on State Highway in San Mateo County in Woodside and Redwood City on Route 84 from Route 280 to Route 101

BID CONTRACT #:

04-0K7804

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Redwood City, CA

BID DUE DATE:

10-25-2023 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance.  Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.

Social Media

Copyright © 2024 Compliance News All rights reserved.