Knife River Construction

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Plastic Traffic Drums, Portable Changeable Message Signs, Temporary Radar Speed Feedback Sign System, Automated Flagger Assistance Device Day, SWPPP & Related Items, Erosion Control, Street Sweeping, Temporary Creek Diversion, Treated Wood Waste, Contractor Supplied Biologist, Clearing and Grubbing, Check and test Irrigation Facilities, Asphalt Emulsion (Fog Seal Coat), Data Core, Place AC Dike, Tack Coat, Cold Plane, Drill and Bond (Dowel Bar), Storm Drain Systems, Cured-In-Place Liner, Minor Concrete, Delineators & Markers, Roadside Signs, Striping & Markings, Maintain Existing Traffic Management Systems, Modifying Traffic Monitoring Stations , all trucking and supply of materials.


PROJECT NAME:

Hwy 20 Cold Plane and Overlay 20/49 Split

BID CONTRACT #:

03-4H0704

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Hwy 20/49, Grass Valley, CA, 95945

BID DUE DATE:

09-14-2023 at 02:00 PM

OUTREACH COORDINATOR:

Marc Madsen

TELEPHONE:

5308916555

FAX:

5308946220

ADDRESS:

1764 Skyway, Chico, CA, 95928

PROJECT DETAILS:

Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation. Plans and Specifications are made available for viewing on the Caltrans website and Knife Rivers office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.