is seeking certified and qualified DBE subcontractors and/or suppliers to provide Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Plastic Traffic Drums, Portable Changeable Message Signs, Temporary Radar Speed Feedback Sign System, Automated Flagger Assistance Device Day, SWPPP & Related Items, Erosion Control, Street Sweeping, Temporary Creek Diversion, Treated Wood Waste, Contractor Supplied Biologist, Clearing and Grubbing, Check and test Irrigation Facilities, Asphalt Emulsion (Fog Seal Coat), Data Core, Place AC Dike, Tack Coat, Cold Plane, Drill and Bond (Dowel Bar), Storm Drain Systems, Cured-In-Place Liner, Minor Concrete, Delineators & Markers, Roadside Signs, Striping & Markings, Maintain Existing Traffic Management Systems, Modifying Traffic Monitoring Stations , all trucking and supply of materials.
Hwy 20 Cold Plane and Overlay 20/49 Split
03-4H0704
Caltrans
Hwy 20/49, Grass Valley, CA, 95945
09-14-2023 at 02:00 PM
Marc Madsen
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation. Plans and Specifications are made available for viewing on the Caltrans website and Knife Rivers office.