is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Abatement, Site Demo, Concrete, Masonry, Final Cleaning, Structural Steel, Metal Decking, Rough Carpentry, Casework, Roofing, Insulation, Doors/Frames/Hardware, Skylights, Coilig Doors, Windows, Plaster, Gypsum, Acoustical Ceilings, Flooring, FRP, Painting, Signage, Accessories, Food Service Equipment, Fire Sprinklers, Plumbing, HVAC, Electrical, Earthwork, Fence, Utilities
James Logan High School Central Kitchen
Not Available
New Haven Unified School Disctirct
2150 H Street, Union City, CA, 94587
10-03-2023 at 02:00 PM
Jake French
650-364-8141
650-367-7645
2596 Bay Road, Redwood City, CA, 94063
PROJECT DETAILS:
Bids Due
Oct 3, 2023 at 2:00 PM PDT
Location
2150 H Street, Union City, CA 94587,
Pre-Bid RFIs Due
Sep 26, 2023 at 12:00 PM PDT
Expected Start
Oct 18, 2023
Expected Finish
Jul 22, 2024
Project Size
5,000,000 sq. ft.
Architect
196 Architects
Description
Construction of converting the existign marching band rooms into a central production kitchen. The work includes but is not limited to: site demo, HAZMAT abatement, site work, structural, mechanical, electrical, plumbing and low voltage installations and ADA compliance works.
Prevailing Wage Project. LCP= Labor Complince- DIR cert pay is required.
ALL MEP"S must be prequaliifed with the district.
Public
This project is available for public bidding via the Beals Martin, Inc. Public Plan Room