Trade Journal

Flatiron West, Inc.

is seeking certified and qualified Los Angeles County of Metropolitan Transportation Authority subcontractors and/or suppliers to provide Subcontractors and Suppliers for the following, but not limited to scopes of work: Aggregate Supply, Asphalt Paving, Bridge Bearing Pad Supply, Bridge Demo, CIDH Pile, Clear and Grub, Cold Plane AC, Concrete Barrier, Concrete Supply, Formliner Supply, Demolition, Electrical, Erosion Control, Fencing, Furnish and Erect Precast Girders, Hazardous Materials Hauling, Joint Seal, Joint Seal Assembly Supply , Misc. Iron & Steel Supply, MSE Panel Supply, Masonry, Minor Concrete, Misc. Metals Supply, Overhead Signs, PCC Material Supply, Pipe Supply, Prestressing, QC Testing, Ready Mix Concrete Supply, Geotextile Supply, Reinforcing Steel, Saw and Seal PCC, Slope Paving, Street Sweeping, Striping, Structural Steel, Waterworks Supply, MLCP Pipe Supply, Survey, Underground


PROJECT NAME:

Turnbull Canyon Grade Separation Project

BID CONTRACT #:

Contract No. 16-04

AWARDING AGENCY:

San Gabriel Valley Council of Governments (SGVCOG)

PROJECT LOCATION:

Turnbull Canyon Road, City of Industry, CA

BID DUE DATE:

10-12-2023 at 10:00 AM

OUTREACH COORDINATOR:

Jannette Carter

TELEPHONE:

(909) 597-8413 ext. 2009

FAX:

(858) 271-1330

ADDRESS:

14726 Ramona Avenue, Suite 300, Chino, CA, 91710

PROJECT DETAILS:

Plans and specifications are available to download, at no cost, from the SGVCOG PlanetBids portal https://pbsystem.planetbids.com/portal/15588/bo/bo-search (Registration Required). Additionally, plans and specifications are available to view at Flatiron’s Chino, CA and San Diego, CA offices. Please send an email to socalbids@flatironcorp.com to make an appointment to view the documents.

 

This project has a 12% SBE Goal. In addition to request for participation from SBE subcontractors and suppliers, Flatiron requests non-SBE subcontractors to provide lower-tier SBE participation. Bidders are required to indicate lower-tier SBE participation information to be evaluated as part of their quote.

 

Quotes must be valid for same duration as specified by Owner for contract award. Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation. Flatiron intends to work cooperatively with all firms for scopes of work you are licensed and qualified to perform. Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, and materials is available upon request. Additionally, please contact us if you require technical assistance.

 

Subcontractors are required to possess and maintain a current contractor’s license and must also be registered with the Department of Industrial Relations (DIR) as required by Public Contract Code Section 1725.5. Subcontractors will be required to execute Flatiron’s Standard Subcontract Terms and Conditions and meet insurance requirements. A copy of the document in electronic format is available upon request.

 

Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron or any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100 percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%. The surety on the bonds must be a California admitted surety.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.