Trade Journal

United Building Contractors

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide The Modular Buildings are Already Secured, Please do not bid the supply or installation of modular buildings. Items that do need pricing related to the modulars consist of: The Foundations and embeds, signage, fire extinguishers, power, data, AV, intrusion, fire alarm, and stucco. Construct new work to install New Classroom Buildings and surrounding site work including but not limited to: Site Hard Demolition, Utility Locating, Underground Utilities (Storm and RWL Connections, Sewer, Water), Grading and Baserock, Concrete Flatwork, Foundations (Modulars, Play Equipment, Shade Structure), Paving, Playground Surfacing, Playground Equipment Installation, Shade Structure Supply and Installation, Fencing and Gates, Irrigation and Landscaping, Signage, Fire Extinguishers, Electrical and Low Voltage (Data, Fire Alarm and Misc.) Lath and Plaster Link to Plans and Specifications: https://ubcinc.box.com/s/islk42stds2fdeu2vd1bbgp7y8zhkhrz


PROJECT NAME:

A Proposed TK/K Classroom Addition at Poplar Avenue Elementary School

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Termalito Union School District

PROJECT LOCATION:

2070 Poplar st., Oroville, CA, 95965

BID DUE DATE:

10-24-2023 at 04:00 PM

OUTREACH COORDINATOR:

Isabel Ruiz

TELEPHONE:

5303458455

FAX:

Not Available

ADDRESS:

PO Box 6039, Chico, CA, 95927

PROJECT DETAILS:

“We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available through dropbox link below.

 

https://ubcinc.box.com/s/islk42stds2fdeu2vd1bbgp7y8zhkhrz

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.