Charles Pankow Builders, Ltd.

is seeking certified and qualified DBE, DVBE, Los Angeles County CBE, MBE, SBE and WBE subcontractors and/or suppliers to provide List of subcontractors and/or suppliers for the following scopes, but not limited to: o Earthwork and grading o Asphalt paving o CMU o Misc. metal o Finish carpentry o Waterproofing o Roofing o Sheet metal and flashing o Ceramic tile o Flooring o Site hardscape and landscape o Fences and gates o Paint and wall covering o Signage o Accessories o Survey o SWPPP


PROJECT NAME:

LOS ANGELES GENERAL MEDICAL CENTER MENTAL HEALTH URGENT CARE CENTER (MHUCC) AND RESIDENTIAL WITHDRAWAL MANAGEMENT FACILITY (RWMF)

BID CONTRACT #:

RFP NUMBER: BRC0000454

AWARDING AGENCY:

COUNTY OF LOS ANGELES

PROJECT LOCATION:

1240 N. Mission Road, Los Angeles, CA, 90033

BID DUE DATE:

11-02-2023 at 05:00 PM

OUTREACH COORDINATOR:

Jin Choi

TELEPHONE:

626.705.1711

FAX:

Not Available

ADDRESS:

199 S. Los Robles Ave Suite 300, Pasadena, CA, 91101

PROJECT DETAILS:

  • Pankow is proposing on the LOS ANGELES GENERAL MEDICAL CENTER MENTAL HEALTH URGENT CARE CENTER (MHUCC) AND RESIDENTIAL WITHDRAWAL MANAGEMENT FACILITY (RWMF) as a DBE for the County of Los Angeles.
  • Project consists of a 34,000sf 2- story Mental Health Urgent Care Clinic and Residential Withdrawal Management Facility.
  • Construction is schedule to start late Q1 / early Q2 of 2024 with an approximate 18 month construction schedule.
  • Pankow is an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.  All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.
  • Bidding will phased with the first phase commencing in Q1 of 2024 with early scope.  Scopes and dates future phases will be determined at a later date.
  • Plans and specifications are not available at this time.  Plans will be made available via BuildingConnected in Q1 of 2024.
  • All bidders will need to participate in Pankow’s prequalification process during the bidding stage for evaluation in order to enter into a subcontract agreement with Pankow.
  • List of subcontractors and/or suppliers for the following scopes, but not limited to:
    • Earthwork and grading
    • Asphalt paving
    • CMU
    • Misc. metal
    • Finish carpentry
    • Waterproofing
    • Roofing
    • Sheet metal and flashing
    • Ceramic tile
    • Flooring
    • Site hardscape and landscape
    • Fences and gates
    • Paint and wall covering
    • Signage
    • Accessories
    • Survey
    • SWPPP
  • Project has a CWA in place and all bidders will need to satisfy the requirements stipulated in the CWA.  A copy of the CWA will be provided during the bidding process.
  • Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company as necessary.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.