is seeking certified and qualified DBE subcontractors and/or suppliers to provide Traffic Control System, Lead Compliance Plan, Water Pollution Control Plan, Remove Concrete, Roadway Excavation, Aggregate Base, Minor Concrete (Curb and Gutter), Minor Concrete (Sidewalk), Minor Concrete (Valley Gutter), Detectable Warning System, Adjust Utility Iron – City Storm Drain Manhole, Adjust Utility Iron – SPMUD Sanitary Sewer Manhole, CCTV Inspection, Adjust Utility Iron – PCWA Valve Box/ARV Box, Full Width Grinding, Hot Mix Asphalt Overlay, Hot Mix Asphalt Plug Pave, Thermoplastic Stripe - Detail 9, Thermoplastic Stripe - Detail 22, Thermoplastic Stripe - Detail 25, Thermoplastic Stripe - Detail 27B, Thermoplastic Stripe - Detail 37B, Thermoplastic Stripe - Detail 38, Thermoplastic Stripe - Detail 39, Thermoplastic Stripe - Detail 39A, Thermoplastic Stripe - Detail 40, Thermoplastic Green Pavement Markings, Thermoplastic Pavement Markings, New Roadside Sign(s) to New Post, Remove Roadside Sign and Post, Detector Loop (Type A, B, and D), Detector Handhole and Conduit, all trucking and supply of materials.
Park Drive Pavement Rehabilitation
STPL 5095 (026)
City of Rocklin
Park Drive between Stanford Ranch Roand and Bay Street, Rocklin, CA, 95765
11-08-2023 at 02:00 PM
Levi Hubbard
5308916555
5308946220
1764 Skyway, Chico, CA, 95928
PROJECT DETAILS:
Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation. Plans and Specifications are made available for viewing on the Caltrans website and Knife Rivers office.