Rege Construction, Inc.

is seeking certified and qualified DBE, DVBE, MBE, SBE, WBE and UDBE subcontractors and/or suppliers to provide MOBILIZATION & DEMOBILIZATION, CLEARING, GRUBBING, AND STRIPING, DEMOLITION, TEMPORARY DEWATERING, SWPPP COMPLIANCE, TRIBAL MONITORING, TREE REMOVAL, ELECTRICAL, EROSION CONTROL AND PLANTING, PLC PROGRAMMING AND SCADA CONFIGURATION ALLOWANCE, EARTHWORK, VEGETATED ROCK SLOPE PROTECTION, OUTFALL PROTECTION, ENGINEERED STREAMBED MATERIAL, VEGETATED SOIL LIFT, SHRIMP HABITAT, CLASS II AGGREGATE BASE, POND LINING, POND UNDERDRAIN SYSTEM, POND INLET PIPING, POND DISCHARGE PIPING, 2’X2’ DRAINAGE INLET, CONCRETE – POND STRUCTURES, DEMOLISH ABANDONDED SANITARY SEWER CROSSINGS, RECYCLED WATER FORCE MAIN, FLOW EQUALIZATION BASIN CONNECTION, REPLACE BROKEN VALVE WITH CHECK VALVE, MOTOR OPERATED GATE VALVES 7&8, CONCRETE CULVERT HEADWALL, NAPA RIVER LEVEL TRANSDUCER ASSEMBLY.


PROJECT NAME:

Riverside Ponds & Headworks Mitigation Project

BID CONTRACT #:

21-5547

AWARDING AGENCY:

City of Calistoga

PROJECT LOCATION:

Napa Valley Vine Trail, Calistoga, CA, 94515

BID DUE DATE:

12-20-2023 at 12:00 PM

OUTREACH COORDINATOR:

Zach Rege

TELEPHONE:

(707) 894-5143

FAX:

(707) 894-5141

ADDRESS:

600 Santana Dr., Cloverdale, CA, 95425

PROJECT DETAILS:

WORK WILL BE BROKEN DOWN TO FEASIBLE UNITS. PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.