W. A. Thomas Co. Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Selective Demolition, Hazmat Abatement, Concrete, Rebar, Metal Fabrications, Rough Carpentry, Plastic-Laminate-Clad Architectural Cabinets, Ornamental Woodwork, Joint Sealers, Gypsum Board, Acoustical Tile Ceilings, Resinous Flooring, Interior Paint, Visual Display Units, Signage, Toilet/Bath/Laundry Accessories, Fire Protection Cabinets, Fire Extinguishers, Food Service Equipment, Roller Window Shades, Quartz Agglomerate Countertops, HVAC, Testing Adjusting and Balancing and Electrical


PROJECT NAME:

Willard CTE Project

BID CONTRACT #:

PROJECT/CONTRACT NUMBER: 131.2101

AWARDING AGENCY:

Berkeley Unified School District

PROJECT LOCATION:

2425 Stuart Street,, Berkeley, CA, 94702

BID DUE DATE:

03-10-2022 at 02:00 PM

OUTREACH COORDINATOR:

James Smith

TELEPHONE:

Not Available

FAX:

925-228-6932

ADDRESS:

2356 Pacheco Blvd. , Martinez, CA, 94553-2038

PROJECT DETAILS:

BID DATE:     March 10, 2022 (Thursday) @ 2:00pm

Project:           Willard CTE Project

Located:         Berkeley, California

Description: The Work of this Project consists of: Renovation of existing home economics classroom, work includes removal of existing built-in elements, furred walls, and finishes; installation of new finishes; installation of new food service equipment; modification to existing structural, mechanical, and electrical systems and other Work indicated in the Bidding Documents.  The Construction Trades involved the following, and not necessarily limited to: Selective Demolition, Hazmat Abatement, Concrete, Rebar, Metal Fabrications, Rough Carpentry, Plastic-Laminate-Clad Architectural Cabinets, Ornamental Woodwork, Joint Sealers, Gypsum Board, Acoustical Tile Ceilings, Resinous Flooring, Interior Paint, Visual Display Units, Signage, Toilet/Bath/Laundry Accessories, Fire Protection Cabinets, Fire Extinguishers, Foodservice Equipment, Roller Window Shades, Quartz Agglomerate Countertops, HVAC, Testing Adjusting and Balancing and Electrical etc. This is a PLA job.

Owner:  Berkeley Unified School District                    Architect:  DIALOG                                 

Project Duration:  04/07/22- 08/14/2022                        Project Cost Estimate:  $820K

Subject:          REQUEST FOR SUB BIDS

We hereby request your assistance in bidding on the above referenced project. 

Plans are available for review in the plan room of our office; electronic files are available for download from our Dropbox link at:    

https://www.dropbox.com/sh/v8o0nnxcfmzn2bh/AABZITrsthVVpUauof1XpyFYa?dl=0

other possible sources for obtaining the plans include: Bay Area Builder’s Exchanges, Daily Pacific Builders, etc.  If you have any questions, please call or e-mail Simon Chiu / Jim Smith.  If would like to make an appointment for review of these plans, please call Sonia/Jenny, in our office, at (925) 228-9600.

W. A. THOMAS CO., INC.

Estimator:  Jim Smith, jim@wathomas.net and Simon Chiu, simon@wathomas.net

On Bid Day, send proposals to bids@wathomas.net or Fax: (925) 228-6932

We encourage and support participation of DVBE, SBE, SLBE, MBE, WBE and OBE

Please note that 100% Payment & Performance Bonds may be required. Assistance can be provided. 

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Please FAX / EMAIL this response to us at (925) 228-6932 or bids@wathomas.net ASAP.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.