is seeking certified and qualified DBE subcontractors and/or suppliers to provide SCHEDULE A – WOODRUFF LANE BRIDGE AT JACK SLOUGH ITEM UNIT OF ESTIMATED NO. DESCRIPTION MEASURE QUANTITY 1 TRAFFIC CONTROL SYSTEM LS 1 2 WATER POLLUTION CONTROL PROGRAM LS 1 3 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 2,847 4 (F)TREAT BRIDGE DECK SQFT 2,847 5 FURNISH BRIDGE DECK TREATMENT MATERIAL (METHACRYLATE) GAL 38 6 PAVEMENT MARKER (RETROREFLECTIVE) EA 10 7 REPLACE OBJECT MARKER (TYPE P) EA 4 8 6" THERMOPLASTIC TRAFFIC STRIPE (DOUBLE YELLOW DETAIL 22) LF 100 9 6" THERMOPLASTIC TRAFFIC STRIPE (WHITE DETAIL 27B) LF 200 10 REMOVE TRAFFIC STRIPE LF 300 SCHEDULE B – SIMPSON LANE OVER YUBA RIVER ITEM UNIT OF ESTIMATED NO. DESCRIPTION MEASURE QUANTITY 1 TRAFFIC CONTROL SYSTEM LS 1 2 CONSTRUCTION AREA SIGNS LS 1 3 WATER POLLUTION CONTROL PROGRAM LS 1 4 REMOVE ASPHALT CONCRETE SURFACING FOR BRIDGE DECK SQFT 16,414 5 HOT MIX ASPHALT (TYPE A) TON 58 6 COLD PLANE ASPHALT CONCRETE PAVEMENT FOR ROADWAY APPROACH SQFT 3,200 7 (F) CLEAN EXPANSION JOINT LF 300 8 JOINT SEAL (MR 1/2") TYPE A LF 300 9 REMOVE UNSOUND CONCRETE CF 789 10 FURNISH POLYESTER CONCRETE OVERLAY CF 2,840 11 (F) PLACE POLYESTER CONCRETE OVERLAY SQFT 16,414 12 PAVEMENT MARKER (RETROREFLECTIVE) EA 41 13 6" THERMOPLASTIC TRAFFIC STRIPE (DOUBLE YELLOW DETAIL 22) LF 49 14 6" THERMOPLASTIC TRAFFIC STRIPE (WHITE DETAIL 27B) LF 981 SCHEDULE C – PEORIA ROAD OVER DRY CREEK ITEM UNIT OF ESTIMATED NO. DESCRIPTION MEASURE QUANTITY 1 TRAFFIC CONTROL SYSTEM LS 1 2 WATER POLLUTION CONTROL PROGRAM LS 1 3 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 4,830 4 (F) TREAT BRIDGE DECK SQFT 4,830 5 FURNISH BRIDGE DECK TREATMENT MATERIAL (METHACRYLATE) GAL 65 SCHEDULE D – RIDGE ROAD OVER OREGON CREEK ITEM UNIT OF ESTIMATED NO. DESCRIPTION MEASURE QUANTITY 1 TRAFFIC CONTROL SYSTEM LS 1 2 WATER POLLUTION CONTROL PROGRAM LS 1 3 (F) CLEAN EXPANSION JOINT LF 66 4 JOINT SEAL (MR 1/2") TYPE A LF 66 5 REMOVE UNSOUND CONCRETE CF 58 6 PREPARE CONCRETE BRIDGE DECK SURFACE SF 4,985 7 FURNISH POLYESTER CONCRETE OVERLAY CF 58 8 (F)PLACE POLYESTER CONCRETE OVERLAY SQFT 457 9 TREAT BRIDGE DECK SQFT 4,985 10 FURNISH BRIDGE DECK TREATMENT MATERIAL (METHACRYLATE) GAL 67 11 6" THERMOPLASTIC TRAFFIC STRIPE (DOUBLE YELLOW DETAIL 21) LF 153 12 6" THERMOPLASTIC TRAFFIC STRIPE (WHITE DETAIL 27B) LF 306 13 THERMOPLASTIC PAVEMENT MARKING (AHEAD) EA 1 14 REMOVE PAVEMENT MARKING "AHEAD" SQFT 31
County of Yuba Bridge Preventative Maintenance
2023-6100
County of Yuba
Woodruff Lane Bridge, County of Yuba, CA, 95977
11-27-2023 at 05:00 PM
John Campbell
6024371711
6024371821
1310 W. 23rd Street, TEMPE, AZ, 85282
PROJECT DETAILS:
Truesdell Corporation of California, Inc is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Truesdell Corporation of California, Inc is a union signatory contractor. Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies. Please contact us should you need assistance in obtaining the plans, specifications and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.
PDF ATTACHMENTS: