is seeking certified and qualified City of San Francisco LBE subcontractors and/or suppliers to provide 02 41 19 SELECTIVE DEMOLITION; 03 10 00 CONCRETE FORMING AND ACCESSORIES; 03 20 00 CONCRETE REINFORCING; 03 30 00 CAST-IN-PLACE CONCRETE; 03 37 13 SHOTCRETE; 03 60 00 GROUTING; 05 05 19 POST-INSTALLED CONCRETE ANCHORS; 05 12 00 STRUCTURAL STEEL FRAMING; 09 97 00 INTERNAL REPAIR OF STEEL PIPE USING BONDED CFRP LAMINATES; 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL; 26 05 01 ELECTRICAL GENERAL PROVISIONS; 26 05 13 MEDIUM VOLTAGE CABLES; 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES; 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS; 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS; 26 05 33.26 PVC COATED GALVANIZED RIGID STEEL (PGRS) CONDUIT AND SYSTEM COMPONENTS; 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS; 26 05 73 SHORT CIRCUIT COORDINATION STUDY AND ARC FLASH HAZARD ANALYSIS; 26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS; 26 18 39.1 MEDIUM VOLTAGE VARIABLE FREQUENCY DRIVE-AIR COOLED; 26 29 23 LOW VOLTAGE VARIABLE FREQUENCY DRIVES; 40 05 00 GENERAL MECHANICAL REQUIREMENTS; 40 05 07 PIPE SUPPORTS; 40 05 53 VALVES; 40 05 96 VIBRATION AND SEISMIC CONTROL FOR PROCESS EQUIPMENT; 40 06 00 IDENTIFICATION FOR PROCESS EQUIPMENT; 40 23 00 PROCESS PIPING; 40 61 21 PROCESS AND FACILITY CONTROL SYSTEM TESTING; 40 70 00 INSTRUMENTATION FOR PROCESS SYSTEM; 40 90 00 COMMON WORK RESULTS OF INSTRUMENTATION AND CONTROL SYSTEMS (ICS); 40 94 31 CONTROL PANEL CONSTRUCTION; 40 96 25 CONTROL NARRATIVE; 46 21 16 FLEXIBLE RAKE BAR SCREENS
Channel Pump Station Bar Screen Replacement
WW-749
City & County of San Francisco
455 Berry Street, San Francsico, CA
12-07-2023 at 02:00 PM
Leah Oba
415-456-8972
Not Available
5400 Hanna Ranch Road, Novato, CA, 94945
PROJECT DETAILS:
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unlessregistered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirementfor bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on apublic works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Codesection 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certificationof insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with allSubcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department isavailable for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration(www.sba.gov), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and DisadvantagedBusiness Utilization (www.osdbu.dot.gov) may also be able to offer financial assistance and/or information regarding insurance and bonding.Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Mondaythrough Friday from 7:30 AM to 4:00 PM.
Anyone requesting plans and specifications must sign a confidentiality agreement before receiving them.
Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Leah Oba
PHONE: (415) 456-8972
EMAIL: bids@tbcorp.com