is seeking certified and qualified DBE subcontractors and/or suppliers to provide Bugler Construction is seeking DBE and small business companies to submit quotes for any scope of work/bid items relevant to this project that they are classified to perform including but not limited to the items shown below. Please see the list of bid items for more information. LEAD COMPLIANCE PLAN, CRITICAL PATH SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CONSTRUCTION RENTALS, TEMPORARY BARRIER SYSTEM, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, SAMPLING & REPORTS, STORM WATER PROTECTION/EROSION CONTROL, STREET SWEEPING, WASTE DISPOSAL, EXCAVATION, CONSTRUCTION MATERIALS, PLANTING & LANDSCAPE/IRRIGATION WORK, ASPHALT WORK, CONCRETE WORK, GROSS SOLIDS REMOVAL DEVICES/TRASH NET, REINFORCED CONCRETE PIPE, TEMPORARY & PERMANENT BARRIERS, INSTALL, FURNISH & REMOVE SIGNS, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TRUCKING
Install gross solids removal devices and trash nets.
04-0Q2104
Caltrans
Various Locations Route 80, Contra Costa County, CA, 94803
12-14-2023 at 02:00 PM
Glenn Bugler
5105798711
9254167746
4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588
PROJECT DETAILS:
Bugler Construction, Inc. is actively seeking subcontractors and suppliers on this project. Subcontractors must possess a valid California Contractors License and have current registration with the California Department of Industrial Relations. Subcontractors must be able to provide current general liability insurance, workers compensation insurance and be prepared to provide payment and performance bonds. Bugler will pay cost of bonds up to 2.0% of full subcontract amount of this project. Bugler will assist in obtaining insurance, bonds, lines of credit, supplies, materials and equipment. Plans and Specifications can be viewed by appointment at our Pleasanton Office or sent electronically upon request. Bugler is signatory to the operators, laborers, cement mason and carpenters unions. Subcontractors will need to be signatory or sign a project labor agreement with approate union.