Bugler Construction, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Bugler Construction is seeking DBE and small business companies to submit quotes for any scope of work/bid items relevant to this project that they are classified to perform including but not limited to the items shown below. Please see the list of bid items for more information. LEAD COMPLIANCE PLAN, CRITICAL PATH SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, CONSTRUCTION RENTALS, TEMPORARY BARRIER SYSTEM, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, SAMPLING & REPORTS, STORM WATER PROTECTION/EROSION CONTROL, STREET SWEEPING, WASTE DISPOSAL, EXCAVATION, CONSTRUCTION MATERIALS, PLANTING & LANDSCAPE/IRRIGATION WORK, ASPHALT WORK, CONCRETE WORK, GROSS SOLIDS REMOVAL DEVICES/TRASH NET, REINFORCED CONCRETE PIPE, TEMPORARY & PERMANENT BARRIERS, INSTALL, FURNISH & REMOVE SIGNS, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TRUCKING


PROJECT NAME:

Install gross solids removal devices and trash nets.

BID CONTRACT #:

04-0Q2104

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Various Locations Route 80, Contra Costa County, CA, 94803

BID DUE DATE:

12-14-2023 at 02:00 PM

OUTREACH COORDINATOR:

Glenn Bugler

TELEPHONE:

5105798711

FAX:

9254167746

ADDRESS:

4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588

PROJECT DETAILS:

Bugler Construction, Inc. is actively seeking subcontractors and suppliers on this project.  Subcontractors must possess a valid California Contractors License and have current registration with the California Department of Industrial  Relations.  Subcontractors must be able to provide current general liability insurance,  workers compensation insurance and be prepared to provide payment and performance bonds.  Bugler will pay cost of bonds up to 2.0% of full subcontract amount of this project.  Bugler will assist in obtaining insurance, bonds, lines of credit, supplies, materials and equipment.  Plans and Specifications can be viewed by appointment at our Pleasanton Office or sent electronically upon request.  Bugler is signatory to the operators, laborers, cement mason and carpenters unions.  Subcontractors will need to be signatory or sign a project labor agreement with approate union. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.