is seeking certified and qualified City of San Diego SLBE/ELBE subcontractors and/or suppliers to provide Demolition, concrete, cast in place, concrete, floor finishes, metal fabrications, pipe and tube railings, rough carpentry, finish carpentry, casework, FRP, roofing, fire and smoke ID, insulation, weather barriers, air barriers, sheet metal flashing and trim, firestopping, joint sealants, door hardware hollow metal doors and frames, flush wood doors, glazing, mirrors, gypsum board, lath, cement plastering, tiling, acoustical ceilings, resilient flooring, architectural vinyl, graphic films, sound absorbing wall and ceiling units, exterior painting, interior painting, high performance coatings, visual display units, magnetic wall boards, panel signage photoluminescent signage, plastic toilet compartments, wall and door protection, toilet accessories, fire protection specialties, metal lockers, appliances, window shades, countertops, plumbing, hvac, electrical, voice/data/IP infrastructure, audio/visual system security system, fire alarm voice evacuation system, grading, aggregate base courses, asphalt paving, site concrete, precast concrete paving, concrete wheel stops, pavement markings, tactile warning surfacing
Modernize Bldg. 4 at West Hills
23-063
Grossmont Union High School District
8756 Mast Blvd, Santee, CA, 92071
12-19-2023 at 02:00 PM
Bree
7605121188
NA
2870 Whiptail Loop East, Suite 225, Carlsbad, CA, 92010
PROJECT DETAILS:
We're seeking bids for an upcoming project and welcome your participation! This project presents an opportunity for DVBE-certified contractors to contribute their skills. If interested, please click on the link below for bid details and specifications. We look forward to your involvement in this venture!
DVBE, WBE, MBE, DBE and SB Subcontractors & Suppliers are encouraged to bid.
All Contractors and Subcontractors must be registered with the Department of Industrial Relations (DIR) at Bid Time. Prevailing Wage Project.
CLICK HERE FOR PLANS, SPECS AND ADDENDUMS
Architect: Ruhnau Clarke Architects
Pre-Bid RFI’s Due: December 8, 2023
Expected Start Date: January 29, 2024
Expected Finish Date: August 10, 2024
PROJECT DESCRIPTION: Modernize building 4 (ASB classroom, student store & teachers’ lounge, bathrooms,offices), replace Kitchen Freezer and Cooler, modernize toilet rooms in the World Language bldg. and the Pack Den bldg. Modernize toilet rooms in the library bldg. (Alt 2), Replace lighting and ceiling tiles in gymnasium (Alt 1), install illuminated exit signs in the Science bldg., the Arts bldg. and the Pack Den bldg.., Miscellaneous ADA site improvements.
PLEASE SUBMIT BIDS TO:
Shannon Maurer: 760-707-2520 / estimating@conanconstruction.com