Riverside Construction Company, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide The following items of work are requested, including but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Wday), Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Plastic Traffic Drums, Portable Radar Speed Feedback Sign System Day, Portable Signal Systems (Ea), Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign (Ea), Temporary Crash Cushion Module, Alternative Temporary Crash Cushion Tl-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Stormwater Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Temporary Creek Diversion Systems, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Contractor-Supplied Biologist (Day), Natural Resource Protection Plan, Remove Concrete (Cy), Remove Concrete (Sqyd), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Topsoil), Rock Excavation, (F) - Structure Excavation (Bridge), (F) - Structure Excavation (Type D), (F) - Structure Excavation (Retaining Wall), (F) - Structure Excavation (Soldier Pile Wall), (F) - Structure Excavation (Soil Nail Wall), (F) - Structure Backfill (Bridge), (F) - Structure Backfill (Retaining Wall), (F) - Structure Backfill (Soil Nail Wall), (F) - Structure Backfill (Soldier Pile Wall), (F) - Pervious Backfill Material (Retaining Wall), (F) - Concrete Backfill (Soldier Pile Wall), (F) - Lean Concrete Backfill, Ditch Excavation, Embankment, Roadside Clearing, Monument Sign Aesthetics, Soil Amendment, Slow-Release Fertilizer, Plant (Group M), Plant (Group U), Plant (Group B)(Contract Grown), Transplant Plant, Maintain Existing Planted Areas, Plant Establishment Work, Duff (Acre), Bonded Fiber Matrix (Sqft), Rolled Erosion Control Product (Blanket), Compost (Cy), Class 2 Aggregate Base (Cy), Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Dike, Ground Anchor (Subhorizontal), Soil Nail, Steel Soldier Pile (2-Hp 12 X 63), Steel Soldier Pile (2-Hp 12 X 53), Steel Soldier Pile (W 18 X 86), Steel Soldier Pile (W 18 X 211), 30" Drilled Hole, 42" Drilled Hole, 24" Cast-In-Drilled-Hole Concrete Piling, (F) - Structural Concrete, Bridge Footing, (F) - Structural Concrete, Bridge, (F) - Structural Concrete, Bridge (Polymer Fiber), (F) - Structural Concrete, Retaining Wall, (F) - Structural Concrete, Barrier Slab, Aggregate Base (Approach Slab), (F) - Structural Concrete, Approach Slab (Type N), Structural Concrete, Approach Slab (Type R), Structural Concrete, Box Culvert, Structural Concrete, Drainage Inlet, (F) - Minor Concrete, (F) - Minor Concrete (Minor Structure), (F) - Minor Concrete (Backfill), Drill And Bond Dowel (Chemical Adhesive)(Lf), Joint Seal (Mr 1"), (F) - Bar Reinforcing Steel (Soil Nail Wall), (F) - Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Box Culvert), (F) - Bar Reinforcing Steel (Retaining Wall, Epoxy Coated), (F) - Bar Reinforcing Steel (Galvanized), Sculpted Shotcrete, (F) - Structural Shotcrete, Timber Lagging, Clean And Paint Steel Soldier Piling, Core And Pressure Grout Dowel, Bridge Removal (Portion), 12" Alternative Pipe Culvert, 15" Alternative Pipe Culvert, 18" Alternative Pipe Culvert, 24" Reinforced Concrete Pipe, 30" Reinforced Concrete Pipe, 42" Reinforced Concrete Pipe, 8" Corrugated Steel Pipe (.079" Thick), Geocomposite Drain, 12" Corrugated Steel Pipe Downdrain (.079" Thick), Entrance Taper, 18" Alternative Flared End Section, 24" Alternative Flared End Section, 30" Alternative Flared End Section, 42" Alternative Flared End Section, Remove Asphalt Concrete Overside Drain, Cable Net Elevated Drapery, Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection (1/2 T, Class Vii, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Gutter) (Cy), Miscellaneous Iron And Steel, (F) - Miscellaneous Metal (Retaining Wall), Adjust Monument Cover To Grade, Prepare And Stain Concrete, Prepare And Stain Shotcrete, Stain Galvanized Surfaces (Ls), Stain Galvanized Surfaces (Lf), Fence (Type Bw, 6-Strand, Metal Post), Chain Link Fence (Type Cl-6), Remove Fence, Remove Pavement Marker, Delineator (Class 1), Guard Railing Delineator, Pavement Marker (Retroreflective), Milepost Marker, Marker (Culvert), Object Marker (Type P), Remove Roadside Sign (Wood Post), Reset Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), (F) - Tubular Bicycle Railing, (F) - Concrete Barrier (Type 60Md Modified), (F) - Concrete Barrier (Type 60M Modified), (F) - Cable Railing, Transition Railing (Type Wb-31), Alternative In-Line Terminal Tl-3, Alternative Crash Cushion Tl-3, Concrete Barrier (Type 60Mc), (F) - California St-75 Bridge Rail (Modified), Remove Guardrail, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 6" Rumble Strip (Asphalt Concrete Pavement), 12" Rumble Strip (Asphalt Concrete Pavement), 6" Traffic Stripe Tape With Contrast (Warranty), Temporary Flashing Beacon Systems, Mobilization


PROJECT NAME:

Construction on State Highway In Riverside County Near Temecula From 0.4 Mile South Of Sage Road To 1.1 Miles South Of Pauba Road

BID CONTRACT #:

08-1G6704

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Route 79, Temecula, CA

BID DUE DATE:

01-31-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alyssa Helm

TELEPHONE:

951-682-8308

FAX:

951-682-8350

ADDRESS:

4225 Garner Rd, Riverside, CA, 92501

PROJECT DETAILS:

Riverside Construction Company, Inc is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. Riverside Construction Company, Inc. is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. Riverside Construction Company, Inc. is interested in soliciting in Good Faith, including assistance in obtaining bonds, lines of credit, insurance, necessary equipment, materials and/or supplies. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by our estimating department. A Worker’s Compensation Waiver of Subrogation will be required. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is required 24 hours prior to bid deadline to allow proper evaluation. Quotes are required to be in accordance with the plans and specifications and good for the contract duration as specified in the bid documents. In order to assist DBE contractors and suppliers, Riverside Construction Company will divide bid items into smaller tasks or quantities when feasible to facilitate maximum Participation.

Please look at the following project information and let us know if you’re interested in providing a quote for any of the material supplies or work on this project. If you have any questions or need additional information, please reply to this email, or contact Bryan Lounsbury estimating@rivconstruct.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.