is seeking certified and qualified DBE subcontractors and/or suppliers to provide CONSTRUCTION AREA SIGNS, CLEARING & GRUBBING, ROADWAY EXCAVATION, LANDSCAPE AND IRRIGATION SYSTEMS,EROSION CONTROL,CLASS 4 AGGREGATE BASE,CLASS 2 AGGREGATE BASE,CEMENT TREATED PERMEABLE BASE, INDIVIDUAL SLAB REPLACEMENT (RSC) DRILL AND BOND DOWEL BAR, HOT MIX ASPHALT (TYPE A),RUBBERIZED HOT MIX ASPHALT (GAP GRADED),ASPHALT RUBBER BINDER, ASPHALTIC EMULSION (FOG SEAL COAT), PRECOATED AGGREGATE (SEAL COAT)-SAMI, HOT MIX ASPHALT (TYPE A) (LARGE STONE MATRIX), CURED IN PLACE PIPELINER, MINOR CONCRETE (CURB AND GUTTER) MINOR CONCRETE ( EXPOSED AGGREGATE CONCRETE), MINOR CONCRETE (MINOR STRUCTURES) CONCRETE DITCH LINING, RUMBLE STRIP, AC DIKE, CIDH CONCRETE PILE (SIGN FOUNDATION),SIGN STRUCTURE (VERSATILE TRUSS), ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEMS, CONCRETE BARRIER, REINFORCING STEEL, REINFORCED CONCRETE PIPE, SLOTTED CORRUGATED STEEL PIPE, MISC IRON & STEEL, TRAFFIC CONTROL, AUTOMATED END OF QUEUE WARNING SYSTEM,TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, PLANE ASPHALT CONCRETE, TREATED WOOD WASTE, VEGETATION CONTROL, THERMOPLASTIC TRAFFIC STRIPING & MARKING, PAINTED TRAFFIC STRIPING & MARKING, CHANGEABLE MESSAGE SIGN SYSTEM, MODIFY RAMP METERING SYSTEMS, CHANGEABLE MESSAGE SIGN SYSTEM,CAMERA SYSTEMS, FIBER OPTIC CABLE SYSTEM, MODIFY SIGN ILLUMINATION SYSTEMS, MODIFY SIGNAL AND LIGHTING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, SUBSURFACE LOCATORS, SUPPLY PORTABLE CONCRETE BARRIER( TYPE 60K)
CT 11-430244 - Place HMA, RHMA, slab replacement, and electrical work
11-430244
Caltrans
RT 125/94, Lemon Grove, CA, 91977
01-23-2024 at 10:00 AM
Amanda Redmond
858-587-3600
858-453-6034
10529 Vine Street, Lakeside, CA, 92040
PROJECT DETAILS:
Hazard Construction Engr LLC is seeking qualified and certified DBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below. A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room.
*Hazard Construction is re-advertising this project in search of adding more DBE participation to our existing contract*
*** THIS IS A PREVAILING WAGE PROJECT ***
IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds.
Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf.
Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action