is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMP DRAINAGE INLET PROTECTION, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, ROADWAY EXCAVATION, ROCK BLANKET, HIGH FRICTION SURFACE TREATMENT, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, DRAINAGE INLET, REMOVE ASPHALT CONCRETE SURFACING, REMOVE PIPE, DETECTABLE WARNING SURFACE, MINOR CONCRETE, REMOVE CONCRETE, MISCELLANEOUS IRON & STEEL, REMOVE PAVEMENT MARKERS, GUARD RAILING DELINEATORS, PAVEMENT MARKERS, FURNISH SINGLE SHEET ALUMINUM SIGNS, REMOVE & INSALL ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, TRANSITION RAILING, END CAP, END ANCHOR ASSEMBLY, ALTERNATIVE CRASH CUSHION, ALTERNATIVE IN-LINE TERMINAL, REMOVE GUARDRAIL, PREFORMED THERMOPLASTIC PAVEMENT MARKING, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, TRAFFIC STRIPE TAPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING CAMERA SYSTEMS, MODIFYING SIGNAL & LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS, MODIFYING FIBER OPTIC CONDUIT AND CABLE
Modify Ramp Metering Systems
07-357004
Caltrans
Los Angeles County, Inglewood & Hawthorn, CA, 90250
01-17-2024 at 02:00 PM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
PDF ATTACHMENTS: