Bugler Construction, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Bugler Construction is seeking DBE & Small Business companies to submit quotes for any scope of work/bid items relevant to this project that they are classified to perform. Please see the listed bid items below: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (PAINT), TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, CLEARING AND GRUBBING, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, FIBER ROLLS, COMPOST, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE F), REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BARRIER SLAB, REMOVE RETAINING WALL (PORTION), REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN (WOOD POST), REMOVE ROADSIDE SIGN PANEL, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), MIDWEST GUARDRAIL SYSTEM (8' WOOD POST), TUBULAR BICYCLE RAILING, TRANSITION RAILING (TYPE WB-31), BURIED POST END ANCHOR ASSEMBLY (TYPE B-F), ALTERNATIVE IN-LINE TERMINAL TL-3, CALIFORNIA ST-75 BRIDGE RAIL, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER (TYPE K), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE In addition to the listed bid items, Bugler Construction is seeking quotes for construction rentals, miscellaneous construction supplies, and trucking rates. We will consider subcontracting any and all scopes of work quoted by interested companies.


PROJECT NAME:

Barrier Upgrade on HWY 1

BID CONTRACT #:

04-0Q6104

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

PM 37-38, Pacifica, CA, 94037

BID DUE DATE:

02-15-2024 at 02:00 PM

OUTREACH COORDINATOR:

Glenn Bugler

TELEPHONE:

5105798711

FAX:

9254167746

ADDRESS:

4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588

PROJECT DETAILS:

Bugler Construction, Inc. is actively seeking subcontractors and suppliers on this project.  Subcontractors must possess a valid California Contractors License and have current registration with the California Department of Industrial  Relations.  Subcontractors must be able to provide current general liability insurance,  workers compensation insurance and be prepared to provide payment and performance bonds.  Bugler will pay cost of bonds up to 2.0% of full subcontract amount of this project.  Bugler will assist in obtaining insurance, bonds, lines of credit, supplies, materials and equipment.  Plans and Specifications can be viewed by appointment at our Pleasanton Office or sent electronically upon request.  Bugler is signatory to the operators, laborers, cement mason and carpenters unions.  Subcontractors will need to be signatory or sign a project labor agreement with approate union. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.