is seeking certified and qualified DBE and Port of Long Beach DBE subcontractors and/or suppliers to provide Bar Reinforcing Steel, Cable Railing , Cast-In-Drilled-Hole Concrete Piling , Clearing & Grubbing , Concrete Barrier, Concrete Ditch Lining , Construction Area Signs , Core Concrete, Demolition, Drainage Inlet , Drive Steel Sheet Pile , Earthwork , Furnish Steel Sheet Piling , Ground Anchor (Subhorizontal) , Maintaining Existing Traffic Management System Elements During Construction , Minor Concrete (Gutter) , Miscellaneous Iron & Steel , Modifying Lighting Systems , Modifying Traffic Monitoring Stations , Remove Concrete Pavement And Base, Remove Painted Traffic Stripe , Retaining Wall , Rock Blanket , Rock Slope Protection, Rock Slope Protection Fabric , Signage , Storm Drain System , Structural Concrete , Structural Steel , Swppp, Temporary Barrier System (Type K) , Temporary Crash Cushion Module , Temporary Pavement Marker , Temporary Traffic Stripe (Paint) , Thermoplastic Pavement Marking , Thermoplastic Traffic Stripe, Fencing, Survey & Anti-graffiti coating.
PIER B ON-DOCK RAIL SUPPORT FACILITY – EAST EXPANSION
HD-S3134
Port of Long Beach
PICO AVE BETWEEN PIER B STREET AND PIER D STREET, Long Beach, CA, 90802
03-19-2024 at 02:00 PM
Robert Schoonover
3109015309
Not Available
640 East Arrow Highway, La Verne, CA, 91750
PROJECT DETAILS:
Balfour Beatty Infrastructure Inc. (BBII) is interested in soliciting in Good Faith with DBE’s for this project. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by BBII. Please call for bonding and insurance assistance. Subcontractors should expect to sign the standard BBII subcontract form and provide a waiver of subrogation. It is the Subcontractors’ responsibility to read the Plans and Specs and to acknowledge all Addenda in their Scope and Quotes. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Subcontractor scope (including any conditions or exceptions) is appreciated 48 hours prior to bid deadline to allow proper evaluation. In order to assist DBE Contractors and suppliers, we will divide total requirements into smaller tasks or quantities. BBII is an Equal Opportunity Employer. Contract Specifications and Plans are available from the Owner and per request from BBII.
PDF ATTACHMENTS: