S+B James Construction

is seeking certified and qualified DBE, DVBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Scope: Phase 1 (Non-DSA) MEPF safe-off, interior demolition and exterior painting of existing portable classroom buildings (P08-P21) currently located at Old Franklin Elementary School. S+B James to issue ITBs/scoping mark-ups the week of 3/4 to provide clear bidding instructions. In the meantime, please review the following files for the scope of work: EGUSD Old Franklin Port Survey 2-7-24 Old Franklin Portable Map Designation Phase 2 (DSA) - Anticipated Bid Advertisement: 3/28/24 Interior buildout of existing portable classroom buildings (P08-P21) including but not limited to; casework, acoustical ceiling, tackboard wall panels, painting, plumbing fixtures, HVAC units, light fixtures, LV systems, etc. Phase 2 scope also includes site improvements at various Elk Grove Unified School district elementary campuses as make-ready work prior to the relocation of the existing portable classroom buildings.


PROJECT NAME:

EGUSD - ELOP Multi Site

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Not Available

PROJECT LOCATION:

4011 Hood Franklin Road, Elk Grove, CA, 95829

BID DUE DATE:

03-15-2024 at 05:00 PM

OUTREACH COORDINATOR:

Austin James

TELEPHONE:

9167656750

FAX:

Not Available

ADDRESS:

1450 Halyard Dr Suite 1, WEST SACRAMENTO, CA, 95691

PROJECT DETAILS:

NOTE: This is an S+B James Construction project. Lease-Lease-Back project delivery. Seeking sub vendors and trade partners.

 

Scope:

Phase 1 (Non-DSA)

MEPF safe-off, interior demolition and exterior painting of existing portable classroom buildings (P08-P21) currently located at Old Franklin Elementary School. S+B James to issue ITBs/scoping mark-ups the week of 3/4 to provide clear bidding instructions. In the meantime, please review the following files for the scope of work:

  • EGUSD Old Franklin Port Survey 2-7-24
  • Old Franklin Portable Map Designation

Phase 2 (DSA) - Anticipated Bid Advertisement: 3/28/24

Interior buildout of existing portable classroom buildings (P08-P21) including but not limited to; casework, acoustical ceiling, tackboard wall panels, painting, plumbing fixtures, HVAC units, light fixtures, LV systems, etc. Phase 2 scope also includes site improvements at various Elk Grove Unified School district elementary campuses as make-ready work prior to the relocation of the existing portable classroom buildings.

 

 

Link to documents:

​Folder icon Posting Docs

 

Seeking qualified DVBE, SBE, MBE, WBE, etc. Subs/Vendors/Trade Partners.

 

Project is prevailing wage. Certified Payroll will be required. Skilled + Trained Workforce is required and will be monitored as well.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.