is seeking certified and qualified DBE subcontractors and/or suppliers to provide Demolition, Earthwork, concrete, masonry, structural steel, metal decking, rough carpentry, casework, thermal and moisture, waterproofing, insulation, metal wall, doors and frames, access doors and panels, aluminum and glazing, ceramic tiling, acoustical ceiling, flooring, painting, plumbing, hvac, electrical, low voltage, fire alarm, asphalt paving, concrete paving, fences and gates, storm drain utilities, planting and irrigation
Construction of Transit Security & Operation Building Project
IFB 4-2097
Orange County Transportation Authority
1460 W. Lincoln Avenue, Anaheim, CA, 92801
06-03-2024 at 11:00 AM
Grace Hernal
12133850027
12133850024
520 S. La Fayette Park Place Suite# 503, Los Angeles, CA, 90057
PROJECT DETAILS:
This project is to construct the Transit Security and Operation Center Building , 29,050 SQFT, 2 Story, Type II-B, Group B & A-3, located in the City of Anaheim. The Scope of Works includes but not limited to Demolition, Earthworks, Slab On Grade Foundation with Concrete Pad & Curb, Structural Steel Framing, Metal Stud with Cement Plaster, Masonry & Fiber Cement Exterior Wall, Thermoplastic Roofing Membrane, Hollow Metal Doors & Aluminum Framing Windows. Hydraulic Elevator, Microwave Tower, Parking Lots with Canopies, On-Site and Off-Site Improvements, Environmental Work with Mitigation Monitoring & Reporting Program (MMRP).
1. All Sub Contractors are required to comply with all applicable equal opportunity laws & regulations & register with Department of Industrial Relations pursuant to Labor Code Section 1725.5. 2. All Sub contractors interested in doing business with OCTA are required to register their business on-line at CAMM NET at https://cammnet.octa.net . 3. The Orange County Transportation Authority is utilizing Federal Funds toward this project and is required to implement eleven percent (11% ) DOT- Disadvantage Business Enterprises ( DBE) participation goal. 4. All requests for Approved Equals, Clarification of Specification must be put in writing and must be received by the Authority no later than 5:00 PM on April 2 , 2024 .via US Mail , Courier , Facsimile or Email to Michael Le at mle1@octa.net 5. All DBE Subcontractors & Suppliers shall inform & submit with their proposal DBE Firm Name & Address, Valid DBE Certification as described on DBE Acknowledge & Commitment Form, Exhibit E-1 & E-2. 6. Construction activity shall be within the normal work hours in compliance with City of Anaheim's Regulation & Requirements.
PDF ATTACHMENTS: