Bosco Constructors, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN TIME-RELATED OVERHEAD (WDAY) DISPUTE RESOLUTION ADVISOR ON-SITE MEETING HOURLY OFF-SITE DISPUTE-RESOLUTION- ADVISOR-RELATED TASK CONSTRUCTION AREA SIGN TRAFFIC CONTROL SYSTEM TYPE III BARRICADE CHANNELIZER (SURFACE MOUNTED) PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM TEMPORARY BARRIER SYSTEM TEMPORARY CRASH CUSHION TL-3 JOB SITE MANAGEMENT WATER POLLUTION CONTROL PROGRAM TEMPORARY COVER TEMPORARY DRAINAGE INLET PROTECTION TEMPORARY CONSTRUCTION ENTRANCE STREET SWEEPING TEMPORARY CONCRETE WASHOUT TREATED WOOD WASTE CLEARING AND GRUBBING (LS) ROADWAY EXCAVATION ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) ROADSIDE CLEARING WOOD MULCH CHECK AND TEST EXISTING IRRIGATION FACILITIES OPERATE EXISTING IRRIGATION FACILITIES REMOVE IRRIGATION FACILITY CONTROL AND NEUTRAL CONDUCTORS RISER SPRINKLER ASSEMBLY (GEAR DRIVEN) (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) (F) - 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) (F) - PVC PIPE CONDUIT (SLEEVE) 8" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT CLASS 3 AGGREGATE BASE (CY) LEAN CONCRETE BASE HOT MIX ASPHALT (TYPE A) RUBBERIZED HOT MIX ASPHALT (GAP GRADED) PLACE HOT MIX ASPHALT DIKE (TYPE A) MINOR CONCRETE (STAMPED CONCRETE) REMOVE CONCRETE (CURB AND GUTTER) CHAIN LINK FENCE (TYPE CL-6) WROUGHT IRON FENCE 4' CHAIN LINK GATE (TYPE CL-6) REMOVE CHAIN LINK FENCE REMOVE PAVEMENT MARKER PAVEMENT MARKER (RETROREFLECTIVE) REMOVE ROADSIDE SIGN (WOOD POST) REMOVE ROADSIDE SIGN (METAL POST) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED) FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED) FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-FRAMED) FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED) METAL (ROADSIDE SIGN) ROADSIDE SIGN - ONE POST ROADSIDE SIGN - TWO POST (F) - CABLE RAILING 6" THERMOPLASTIC TRAFFIC STRIPE THERMOPLASTIC PAVEMENT MARKING PAINT TRAFFIC STRIPE (1-COAT) REMOVE PAINTED TRAFFIC STRIPE REMOVE THERMOPLASTIC TRAFFIC STRIPE REMOVE THERMOPLASTIC PAVEMENT MARKING MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION MODIFYING RAMP METERING SYSTEMS MOBILIZATION


PROJECT NAME:

Caltrans 07-346004 - CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM NORTH OF VINELAND AVENUE TO NORTH OF WINNETKA AVENUE

BID CONTRACT #:

07-346004

AWARDING AGENCY:

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

PROJECT LOCATION:

Various Locations From North Of Vineland Avenue To North Of Winnetka Avenue, Tarzana, Encino, & Sherman Oaks, CA, 91403

BID DUE DATE:

05-08-2024 at 02:00 PM

OUTREACH COORDINATOR:

Christian Ortega

TELEPHONE:

(818) 700-0304

FAX:

(818) 280-3444

ADDRESS:

21353 Mayall St. Chatsworth, Chatsworth, CA, 91311

PROJECT DETAILS:

DRAWINGS

https://www.dropbox.com/scl/fo/i6gl7l8zrsnhgfqfsh0na/ALi-ytJLNPNIHjY-Viu_KTs?rlkey=nfb7z87sbxfr4sxad5iwk5pne&dl=0

SPECIFICATIONS

https://www.dropbox.com/scl/fo/ogzd2qp6l12v4m98v5cai/AC3CJOGaCKaI5xar445RCAI?rlkey=a36yzxy1auanpc6p2e3y52cur&dl=0

ADDENDUM

https://www.dropbox.com/scl/fo/iqiogqehw1hoj74tb7d0g/AFf_6Q0qxGvUXu3xq_LPmEc?rlkey=cqgv3j4z7o2l29bqtbrujrdhe&dl=0

Bosco Constructors Inc. is an equal opportunity employer. Bosco Constructors Inc. will provide assistance including but not limited to obtaining bonding, lines of credit, insurance, necessary equipment, supplies and/or materials upon request. Please ensure all communications contain an existing/ active license, DIR Registration, along with related certifications if any.

PDF ATTACHMENTS:

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.