Angeles Contractor, Inc

is seeking certified and qualified ACDBE, DBE, DVBE, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide 02050 DEMOLITION, 02200 EARTHWORK, 02500 ASPHALT PAVING, 02510 BUMPERS & STRIPES, 02550 SITE CONCRETE, 02830 FENCES AND GATES, 03200 REBAR, 03300 BUILDING CONCRETE, 04200 MASONRY, 05100 STRUCTURAL STEEL, 05500 MISCELLANEOUS METALS, 06100 ROUGH CARPENTRY, 06400 CABINETS, 07200 INSULATION, 07460 SIDING, 07464 MINERAL FIBER CEMENT SIDING, 07500 MEMBRANE ROOFING, 07600 SHEET METAL, 08100 DOORS, FRAMES, & HARDWARE, 08800 WINDOWS & GLASS DOORS, 09200 EXTERIOR PLASTER & STUCCO, 09250 METAL STUDS & DRYWALL, 09300 CERAMIC TILE, 09900 PAINTING & COATINGS, 10200 LOUVERS AND VENTS, 10350 FLAGPOLES, 10400 SIGNAGE, 10800 TOILET PARTITIONS & ACCESSORIES, 12520 SHADES, 15300 FIRE SPRINKLERS, 15400 PLUMBING, 15500 HVAC, 16000 ELECTRICAL,


PROJECT NAME:

Prado Regional Park Gatehouse and Monument Sign Replacement

BID CONTRACT #:

ANE223-ANE2C-5351

AWARDING AGENCY:

San Bernandino County

PROJECT LOCATION:

16700 Euclid Ave., Chino, CA, 91708

BID DUE DATE:

05-29-2024 at 10:00 AM

OUTREACH COORDINATOR:

Amir Markazi

TELEPHONE:

6269233800

FAX:

6269233801

ADDRESS:

783 Phillips Drive, City of Industry, CA, 91748

PROJECT DETAILS:

ACI is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No substitutions will be accepted. ACI's listing of a subcontractor is not an acceptance of all or any of that subcontractor's conditions, qualifications, exclusions or exceptions included in the
subcontractor's bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute ACl's standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI's website and at
ACI's office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims
for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements contained in a subcontractor's bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI at its sole discretion, reserves
the right to waive the requirements of such bonds, but only in a writing signed by ACl At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Note that ACI is a signatory to the Painters unions; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade. We are no longer signatory to the carpenters union.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.