Trade Journal

Riverside Construction Company, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Quotes for Services and Supplies requested for the following items for bid including, but not limited to: Concrete Barrier Marker, Resident Engineers Office, Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead (Wday), Renewable Diesel Report, Develop Water Supply, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System Day, Temporary Pavement Marker, Temporary Barrier System, Temporary Pedestrian Access Route, Portable Changeable Message Signs (Ea), Temporary Automated End Of Queue Warning System (Type 1) Day, End Of Queue Monitoring And Warning With Truck Mounted Changeable Message Sign Day, Temporary Crash Cushion Module, Tl-3 Alternative Temporary Crash Cushion, Temporary Crash Cushion (Absorb 350), Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Temporary Soil Binder, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Concrete Washout, Remove Yellow Painted Traffic Stripe (Hazardous Waste), Treated Wood Waste, Contractor-Supplied Biologist (Ls), Invasive Species Control, Noise Monitoring, Remove Concrete (Miscellaneous) (Sqft), Temporary High-Visibility Fence, Clearing And Grubbing (Ls), Roadway Excavation, Roadway Excavation (Type R-1)(Aerially Deposited Lead), Ditch Excavation, Roadside Clearing, Rock Blanket, Packet Fertilizer, Plant (Group U), Plant Establishment Work, Wood Mulch, Modify Irrigation System, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, 12" Welded Steel Pipe Conduit, Move-In/Move-Out (Erosion Control), Rolled Erosion Control Product (Blanket), Hydroseed, Compost (Cy), Incorporate Materials, Permanent Erosion Control Establishment Work, Class 2 Aggregate Base (Cy), Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place Hot Mix Asphalt Dike (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type D), Place Hot Mix Asphalt Dike (Type F), Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Pavement (Sqft), Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement, Isolation Joint Seal (Silicone), 54" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Structural Concrete, Structural Concrete, Drainage Inlet, Minor Concrete (Minor Structure), Furnish Sign Structure (Truss), Install Sign Structure (Truss), Remove Bridge Mounted Sign, Pedestrian Barricade, Remove Asphalt Concrete Surfacing, 24" Alternative Pipe Culvert, 18" Reinforced Concrete Pipe, 24" Reinforced Concrete Pipe, 36" Reinforced Concrete Pipe, Drainage Inlet Marker, 18" Corrugated Steel Pipe Riser (.064" Thick), Grated Line Drain, Remove Culvert (Lf), Remove Headwall, Remove Catch Basin, Cap Inlet, Concrete (Ditch Lining), Rock Slope Protection (1/4 T, Class V, Method B) (Cy), Rock Slope Protection (60 Lb, Class Ii, Method B) (Cy), Rock Slope Protection (20 Lb, Class I, Method B) (Cy), Rock Slope Protection Fabric (Class 8), Minor Concrete (Curb) (Cy), Minor Concrete (Gutter) (Cy), Detectable Warning Surface, Minor Concrete (Miscellaneous Construction), Minor Concrete (Curb And Gutter), Minor Concrete (Driveway), Minor Concrete (Sidewalk), Minor Concrete (Concrete Textured Paving), Minor Concrete (Curb Ramp), Remove Concrete Curb (Lf), Remove Concrete Sidewalk And Driveway, Remove Concrete (Curb And Gutter), Pre/Post Construction Surveys, Miscellaneous Iron And Steel, Modifying Lighting (City Street), Adjust Manhole Frame And Cover (Utility), Reset Survey Monument, Relocate Mailbox, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker, Object Marker (Type P), Object Marker (Type R), Remove Roadside Sign, Remove Sign From Sign Frame, Reset Roadside Sign (One Post), Relocate Roadside Sign-Two Post, Furnish Laminated Panel Sign (1" - Type A), Furnish Single Sheet Aluminum Sign (0.063" - Unframed), Furnish Single Sheet Aluminum Sign (0.080" - Unframed), Furnish Single Sheet Aluminum Sign (0.063" - Framed), Furnish Single Sheet Aluminum Sign (0.080" - Framed), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), End Cap (Type B), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal System, Concrete Barrier (Type 60M), Concrete Barrier (Type 60Md), Remove Temporary Barrier System, Remove Crash Cushion, Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), Thermoplastic Pavement Marking, Remove Painted Traffic Stripe, Signal And Lighting System, Ramp Metering System, Interconnection Conduit And Cable (Ls), Fiber Optic Cable Systems, Temporary Signal Systems, Modifying Lighting Systems, Removing Signal And Lighting Systems, Modifying Lighting, (City Street), Modifying Signal And Lighting (City), Mobilization


PROJECT NAME:

I-215 University Parkway Interchange Project

BID CONTRACT #:

23-1002955

AWARDING AGENCY:

SBCTA

PROJECT LOCATION:

University Parkway & I-215, San Bernardino, CA

BID DUE DATE:

06-12-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alyssa Helm

TELEPHONE:

951-682-8308

FAX:

951-682-8350

ADDRESS:

4225 Garner Rd, Riverside, CA, 92501

PROJECT DETAILS:

NOTE: Riverside Construction Company, Inc. is willing to break items of work into smaller increments to assist DBE Contractors and Suppliers in obtaining work on this project. 100% Performance and Payment bonds required. Subcontractor’s must possess a current contractor’s license. Please contact us for details.

Include with your bid the Time required for Performance of your work and any Delivery Schedules so that we can establish a Flexible Timeframe for your work. Plans & Specifications are available for viewing at our office or obtained from the owner or portions may be emailed upon request.

Bid docs are available for download from our website at bids.rivconstruct.com

Social Media

Copyright © 2024 Compliance News All rights reserved.