is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Landscape/irrigation, Site Utilities
Great Park Synthetic Turf Rehabilitation Project
GP-24-0019
City of Irvine
8000 Great Park Boulevard, Irvine, CA, 92618
05-28-2024 at 03:00 PM
Ethel Montano
619-278-8824
619-278-8761
8884 Jurupa Road, Jurupa Valley, CA, 92509
PROJECT DETAILS:
Great Park Synthetic Turf Rehabilitation
City of Irvine
PROJECT DESCRIPTION:
The work to be performed shall include, but not be limited to: Renovations and improvements to replace existing real turf soccer fields 4 and 7, synthetic turf fields 5 and 6 with updated recreational synthetic turf, decomposed granite, installation of non-recreational synthetic turf south of the soccer fields, cooling systems, miscellaneous clearing and grubbing, earthwork, concrete improvements, storm drain improvements, landscape, and irrigation.
Engineer’s Estimate: $7,320,000
Location: 8000 Great Park Boulevard, Irvine, CA 92618
Project Duration: 120 Working Days (excluding plant establishment); 210 Working Days (including plant establishment)
Labor/Wage: Community Workforce Agreement (CWA)
BID DUE DATE & TIME: Tuesday, May 28, 2024 at end of business day
Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761.
BID DOCUMENTS:
Bid documents are available for download from our website. To access these documents:
https://ohno.sharefile.com/home/shared/foae1e89-1f35-4b1e-8a29-b070cf60ec4e
Enter Email : ohnocc.ca@gmail.com
Enter Password : Yosh1966*
Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.