Trade Journal

Edwards Construction Group

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Site Concrete, Concrete, Masonry, Metals, Wood and Plastics, Architectural Woodwork, Portland Cement Plaster and Metal Lath, Building Insulation, Ceramic Tile and Procelain Tile, Applied Bituminous Roofing, Flashing and Sheet Metal, Fire Stops and Smoke Seals, Joint Sealants, Steel Doors and Frames, Access Panels, Door Hardware, Glazing, Metal Support Systems, Suspended Drywall Grid System, Exterior Gypsum Sheathing, Acoustical Ceilings, Resilient Flooring Vinyl Sheet Flooring, Carpet, Grille Suspended Wood Ceiling System, Paints and Coatings, Concrete Sealer and Dust Proofer Flooring, Visual Display Surfaces, Horizontal Sliding Markerboards, Specialties, Window Shades and Blinds, Bicycle Racks, HVAC, Plumbing, Electrical, Communications, Fire Alarm


PROJECT NAME:

Santa Maria High School Admin to Classroom

BID CONTRACT #:

Project #17-267.2.1

AWARDING AGENCY:

Santa Maria Joint Union School District

PROJECT LOCATION:

901 S Broadway, Santa Maria, CA, 93454

BID DUE DATE:

05-29-2024 at 02:00 PM

OUTREACH COORDINATOR:

Brad Edwards

TELEPHONE:

805-335-1161

FAX:

805-614-9909

ADDRESS:

991 Bennett Avenue, Arroyo Grande, CA, 93420

PROJECT DETAILS:

Edwards Construction Group is currently pursuing the Santa Maria High School Admin to Classroom project for Santa Maria Joint Union High School District.

THE PROJECT INCLUDES THE ALTERATION AND RENOVATION OF THE EXISTING ADMINISTRATION BUILDING TO A CLASSROOM BUILDING. THE RENOVATED CLASSROOM BUILDING WILL CONSIST OF 9 CLASSROOMS, OFFICES, A STAFF ROOM, AND STUDENT AND STAFF TOILET ROOMS, AND ASSOCIATED SITE WORK. NEW POWER AND DATA WILL BE PROVIDED IN EACH OF THE CLASSROOMS, STAFF ROOM, AND OFFICES FOR THIS BUILDING. ADDITIONALLY, NEW MECHANICAL AND PLUMBING SYSTEMS WILL BE PROVIDED.  THIS WILL INCLUDE NEW HEATING AND COOLING UNITS, AIR REGISTERS, AND NEW DISTRIBUTION SYSTEMS IN LIMITED AREAS.  NEW BUILDING PIPING INCLUDING GAS AND WATER, AS WELL AS NEW PLUMBING FIXTURES, WILL BE PROVIDED. NEW ARCHITECTURAL FINISHES WILL BE PROVIDED INCLUDING FLOORING, CARPETING, CEILINGS, WALL COVERING, AND PAINT.

This is a PREVAILING WAGE project.  

We are required to certify that we can either meet the Disabled Veteran Business Enterprise ("DVBE") goal of (3%) participation or make a good faith effort to solicit DVBE participation in this Contract.

All MEP Subcontractors are required to be Pre-qualified with the Santa Maria Joint Unified School District.

BID DATE -  Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 3 hours before the time the bid is due to be considered. 

Please call if you have any questions.

 

Thank you,

Jessica Gregory

Estimating Coordinator

Office: 805-335-1161

Direct: 805-699-6921

Fax:  805-614-9906

E-mail: jg@edwardscongroup.com 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News YouTube Compliance News

Copyright © 2025 Compliance News All rights reserved.