ProWest Constructors

is seeking certified and qualified MBE and WBE subcontractors and/or suppliers to provide misc metals, window film, masonry restoration, metal panels, library equipment, draperies, surveying, final clean, SWPPP erosion control monitoring, SWPPP erosion control implementation, historic treatment, demolition, hazardous material handling, reinforcing steel, cast-in-place concrete, unit masonry, stone veneer, structural steel, ornamental metals, handrails and railings, architectural woodwork, finished carpentry, FRP, waterproofing and dampproofing, thermal insulation, sheet metal flashing and trim, metal siding and wall panels, doors, frames and hardware, glass, storefront and curtain walls, skylights, drywall and metal studs, ceramic tile, acoustical ceilings, resilient flooring and carpet, painting and coatings, signage, toilet partitions and bathroom accessories, lockers, fire extinguishers and cabinets, visual display boards, wall and corner guards, operable partitions, window coverings, elevators, fire protection, plumbing and fixtures, HVAC, electrical, data and telecommunications, fire alarm, audio visual, security detection, alarm and monitoring, earthwork, ac paving, base, striping and signage, site concrete, unit pavers, fences and gates, site furnishings, landscape and irrigation, site utilities


PROJECT NAME:

City of Santa Ana Main Library Renovation

BID CONTRACT #:

22-1380

AWARDING AGENCY:

City of Santa Ana

PROJECT LOCATION:

26 Civic Center Plaza, Santa Ana, CA, 92701

BID DUE DATE:

06-06-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

The project includes site work for surface parking, site utility improvements, entrance walkways, pedestrian lighting, renovation of exterior space, site furnishings, irrigation, and landscaping. The Main Library Building consists of 39,790 square feet and has two floors and a below grade basement. Additional improvements will include but are not limited to hazardous material removal, demolition, repair of historic exterior marble façade, addition of accessible elevator, repair and replacement of north facing historic windows, renovation of interior spaces, mechanical improvements, plumbing improvements, electrical improvements, low voltage, communications, and electrical security. In order for the library to accommodate community needs, new book drop locations, bookmobile area and shared public spaces will developed.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.