Trade Journal

Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, CHANNELIZER (SURFACE MOUNTED), TEMP BARRIER SYSTEM, MOBILE BARRIER SYSTEM, MOBILE BARRIER TRAILER, ALTERNATIVE TEMP CRASH CUSHION, TEMP TRAFFIC SCREEN, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP GRAVEL BAG BERM, TEMP CONSTRUCTION ENTRANCE, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, MONITORING & REPORTINNG), TEMP CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE, INVASIVE SPECIES CONTROL, TEMP HIGH-VISIBILITY FENCE, TEMP CONSTRUCTION MAT, CLEARING & GRUBBING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, STRUCTURAL CONCRETE, DIAPHRAGM BOLSTER, DRILL AND BOND DOWEL, DRILL & BOND DOWEL (CHEMICAL ADHESIVE), CLEAN EXPANSION JOINT, JOINT SEAL, BAR REINFORCING STEEL, ASPHALT MEMBRANE WATERPROOFING, CLEAN STRUCTURAL STEEL, PAINT STRUCTURAL STEEL, SPOT BLAST CLEAN & PAINT UNDERCOAT, ABANDON BRIDGE DECK DRAIN, CORE CONCRETE, ACCESS OPENING (SOFFIT), BRIDGE REMOVAL, FIBER REINFORCED POLYMER SYSTEM (COLUMN), COLUMN CASING, SEAT EXTENDER (PIPE TYPE), CLEAN BRIDGE DECK DRAIN, MISCELLANEOUS METAL (BRIDGE), BRIDGE DECK DRAINAGE SYSTEM, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), CHAIN LINK RAILING, SEVERE-DUTY CRASH CUSHION WIDE,CONCRETE BARRIER, SALVAGE METAL BRIDGE RAILING, REMOVE CRASH CUSHION, PAINT TRAFFIC STRIPE, REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, TRAFFIC STRIPE TAPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING LIGHTING SYSTEMS


PROJECT NAME:

Install Fiber Reinforced Polymer System & Column Casing

BID CONTRACT #:

07-301604

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Various Locations in Los Angeles County, Near Compton,Paramount, Carson & Signal Hill, CA, 90220

BID DUE DATE:

06-20-2024 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Copyright © 2024 Compliance News All rights reserved.