Trade Journal

Bosco Constructors, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN TIME-RELATED OVERHEAD (WDAY) DISPUTE RESOLUTION BOARD ON-SITE MEETING HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM STATIONARY IMPACT ATTENUATOR VEHICLE CHANNELIZER (SURFACE MOUNTED) TEMPORARY BARRIER SYSTEM MOBILE BARRIER SYSTEM MOBILE BARRIER TRAILER ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 TEMPORARY TRAFFIC SCREEN JOB SITE MANAGEMENT STORMWATER POLLUTION PREVENTION PLAN RAIN EVENT ACTION PLAN STORM WATER SAMPLING AND ANALYSIS DAY STORM WATER ANNUAL REPORT TEMPORARY GRAVEL BAG BERM TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY CONCRETE WASHOUT WATER QUALITY SAMPLING AND ANALYSIS DAY WATER QUALITY MONITORING REPORT WATER QUALITY ANNUAL REPORT TEMPORARY CREEK DIVERSION SYSTEMS ASBESTOS COMPLIANCE PLAN REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) INVASIVE SPECIES CONTROL TEMPORARY HIGH-VISIBILITY FENCE TEMPORARY CONSTRUCTION MAT (LS) CLEARING AND GRUBBING (LS) (F) - STRUCTURE EXCAVATION (BRIDGE) STRUCTURE EXCAVATION (TYPE Z-2, AERIALLY DEPOSITED LEAD) STRUCTURE EXCAVATION (TYPE D, TYPE Z-2, AERIALLY DEPOSITED LEAD) STRUCTURE EXCAVATION (ARSENIC TYPE C-1) (F) - STRUCTURE BACKFILL (BRIDGE) (F) - STRUCTURAL CONCRETE, BRIDGE STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R MODIFIED) DIAPHRAGM BOLSTER DRILL AND BOND DOWEL DRILL AND BOND DOWEL (CHEMICAL ADHESIVE)(LF) CLEAN EXPANSION JOINT JOINT SEAL (MR 1/2") JOINT SEAL (MR 1") JOINT SEAL (MR 1 1/2") JOINT SEAL (MR 3") (F) - BAR REINFORCING STEEL (BRIDGE) (F) - ASPHALT MEMBRANE WATERPROOFING CLEAN STRUCTURAL STEEL (EXISTING COLUMN CASING) PAINT STRUCTURAL STEEL (EXISTING COLUMN CASING) SPOT BLAST CLEAN AND PAINT UNDERCOAT ABANDON BRIDGE DECK DRAIN CORE CONCRETE (6") CORE CONCRETE (10") ACCESS OPENING, SOFFIT BRIDGE REMOVAL (PORTION), LOCATION A BRIDGE REMOVAL (PORTION), LOCATION B BRIDGE REMOVAL (PORTION), LOCATION C BRIDGE REMOVAL (PORTION), LOCATION D FIBER REINFORCED POLYMER SYSTEM (COLUMN) (F) - COLUMN CASING SEAT EXTENDER (PIPE TYPE) CLEAN BRIDGE DECK DRAIN (F) - MISCELLANEOUS METAL (BRIDGE) (F) - BRIDGE DECK DRAINAGE SYSTEM REMOVE PAVEMENT MARKER PAVEMENT MARKER (RETROREFLECTIVE) (F) - CHAIN LINK RAILING (TYPE 7 MODIFIED) SEVERE-DUTY CRASH CUSHION WIDE TL-3 (F) - CONCRETE BARRIER (TYPE 836 MODIFIED) SALVAGE METAL BRIDGE RAILING REMOVE CRASH CUSHION PAINT TRAFFIC STRIPE (2-COAT) REMOVE PAINTED TRAFFIC STRIPE REMOVE THERMOPLASTIC TRAFFIC STRIPE 12" TRAFFIC STRIPE TAPE (WARRANTY) 6" TRAFFIC STRIPE TAPE (WARRANTY) 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 17-7) MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION MODIFYING LIGHTING SYSTEMS


PROJECT NAME:

Caltrans 07-301604 CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY AT VARIOUS LOCATIONS

BID CONTRACT #:

07-301604

AWARDING AGENCY:

STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION

PROJECT LOCATION:

E. Artesia Blvd. & Santa Fe Ave., Compton, CA, 90221

BID DUE DATE:

06-13-2024 at 02:00 PM

OUTREACH COORDINATOR:

Christian Ortega

TELEPHONE:

(818) 700-0304

FAX:

(818) 280-3444

ADDRESS:

21353 Mayall St. Chatsworth, Chatsworth, CA, 91311

PROJECT DETAILS:

DRAWINGS

https://www.dropbox.com/scl/fo/oq5ylb8fatlh64uqk057c/AEJ-VbMjeYsi7G7-uzBrk9w?rlkey=78fqrqfjpy233g6rtwb07amox&dl=0

SPECIFICATIONS

https://www.dropbox.com/scl/fo/2qjkp8r8qllj75n42s8of/AP_UF-M2oGzVyIWzN9b9MqQ?rlkey=cwp0vnflp8hu1anmtd3djc224&dl=0

ADDENDUM

https://www.dropbox.com/scl/fo/1mieu74y9anw53h97xpr6/ALnxTLyKwRyxEJk-jgEIFcM?rlkey=ksemxsxd97r8dr53c42hpsaon&dl=0

Bosco Constructors Inc. is an equal opportunity employer. Bosco Constructors Inc. will provide assistance including but not limited to obtaining bonding, lines of credit, insurance, necessary equipment, supplies and/or materials upon request. Please ensure all communications contain an existing/ active license, DIR Registration, along with related certifications if any.

Social Media

Copyright © 2024 Compliance News All rights reserved.