Trade Journal

Kemp Bros. Construction, Inc.

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide Electrical, Mechanical, Metal Studs/Drywall/Plaster, Plumbing, Fire Protection, and Low Voltage. The subcontractors responding to this advertisement must be capable of providing design-assistance and construction, provide a bond, and be willing to hold their bid proposal number for the entire duration of the project, which is currently 1049 working days from NTP to Substantial Completion


PROJECT NAME:

49th Street Elementary School Major Modernization

BID CONTRACT #:

Bid No 2410023 / COLIN No 10372112

AWARDING AGENCY:

Los Angeles Unified School District

PROJECT LOCATION:

750 E. 49th Street, Los Angeles, CA, 90011

BID DUE DATE:

06-28-2024 at 02:00 PM

OUTREACH COORDINATOR:

Sally Truong

TELEPHONE:

562-236-5000

FAX:

562-236-5010

ADDRESS:

10135 Geary Avenue, Santa Fe Springs, CA, 90670

PROJECT DETAILS:

Kemp Bros. Construction, Inc. is seeking certified and qualified subcontractors to provide Electrical, Mechanical, Metal Studs/Drywall/Plaster, Plumbing, Fire Protection, and Low Voltage. The subcontractors responding to this advertisement must be capable of providing design assistance and construction, provide a bond, and be willing to hold their bid proposal number for the entire duration of the project, which is in excess of 4 years.

Design-Assist Subcontractor is required for design and construction. Subs pricing must include Design-Assist (Professional designers are under contract with Kemp), material, labor, and performance bond for a complete construction package for this trade. Plans are generally considered to be Schematic ready. Subs pricing must be all-inclusive of design and construction. No change orders will be considered for minor changes in design. 

Prequalification:

All Mechanical, Electrical, and Plumbing subcontractors must be prequalified. Subcontractors who intend to bid as first-tier subcontractors with the following license classifications must be prequalified: A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46.   

Insurance Requirements: OCIP

 

Project Labor Specifics: (PLA, Prevailing Wage, Certified Payroll)

RFI Questions and Bid Proposals can be emailed to bid@kempbros.com.

SUBCONTRACT BOND REQUIREMENTS

KEMP BROS. CONSTRUCTION, INC. (KBCI) may require all subcontractors bidding on projects to provide payment and performance bonds in the amount of 100% of the subcontract value. KBCI may waive the bond requirement at its sole discretion. The payment and performance bonds must be issued by an admitted surety within ten (10) business days of the receipt of the Subcontract Agreement from KBCI. KBCI shall be named the obligee and shall guarantee prompt and faithful performance of the subcontract scope of work and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract agreement. When so requested, failure by the Subcontractor to provide the requested 100% payment and performance bonds within the time allowed may be reason for KBCI to request substitution of the Subcontractor in accordance with Section 4107 of the Public Contracting Code.

GENERAL SUBCONTRACTING REQUIREMENTS

Each listed Subcontractor must execute KBCI’s standard subcontract agreement with no changes; the standard subcontract is available for review on KBCI’s website. KBCI is currently using Textura® as its internet-based construction invoicing and payment solution. It is assumed that any costs for the use of Textura® incurred by the Subcontractor (s) are included in the Subcontractor’s bid proposal at the time of the bid.

This project is subject to a Project Labor Agreement. Subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements and further agrees to adhere to all of the requirements therein as provided in the bid documents’ General Conditions and Supplemental Conditions.

The State of California requires all contractors bidding or working on any public works project to register with the State Department of Industrial Relations (DIR) and pay an annual registration fee. All contractors awarded a public works contract must be registered with the DIR. Subcontractors providing bids or work without DIR registration will result in a DIR penalty.

SPECIAL NOTICE TO ALL SUBCONTRACTORS

Non-price terms included in competitive bids at bid time may cause your bid to be rejected as non-responsive. KBCI will not accept any provisions or qualifications in subcontractor bids that are not in the bid documents. By submitting a bid on this project, Subcontractor acknowledges that KBCI is relying on the price terms of your bid and that any non-price terms contrary to or in addition to the provisions in the bid documents are null and void.

 