is seeking certified and qualified DVBE subcontractors and/or suppliers to provide GMH Builders is seeking bids from ALL subcontractors, especially DVBE subcontractors, suppliers & truckers for this project for the following trades- Scaffolding, scheduling, survey and staking, temporary site security, Storm Water Pollution Prevention Program, Selective Demolition and Abatement, concrete and rebar, concrete sealing, CMU, structural and misc. steel, metal decking, rough carpentry, casework, plaster paneling, waterproofing, thermal insulation, roofing, metal wall panels, roof accessories, firestopping, joint sealants, expansion joints, doors/frames and hardware, overhead coiling doors, storefronts and glazing, cement plastering, metal stud framing and gypsum board, ceramic tile, acoustical ceilings, wood athletic flooring, resilient flooring, base and carpet tile, resilient athletic flooring, resinous flooring, fabric wrapped wall panels, cementitious wood fiber wall panels, painting, visual display boards, signage, operable partitions, toilet partitions and bathroom accessories, fire extinguishers and cabinets, storage cabinet, metal lockers, food service equipment, projection screens, lab fume hoods, gymnasium equipment, interior scoreboard, roller window shades, entrance floor mat and frames, telescoping stands, site furnishings, metal buildings, modular buildings, fire sprinkler, plumbing, HVAC, electrical, telecommunications and fire alarm, communications, site work and utilities, striping and signage, synthetic turn, fences and gates and landscape irrigation.
Mare Island Technology Academy Prop 51 Project
DSA#02-119524- INC.1, INC. 2, AND INC. 3
Griffin Technology Academies
2 Positive Place, Vallejo, CA, 94589
06-20-2024 at 12:00 PM
Dalia Nieto
7077575050
7077814007
19150 Sonoma Hwy, Sonoma, CA, 95476
PROJECT DETAILS:
DVBE Goal: 3% Engineer's Estimate $55,100,000
General Work Description:
DSA#02-119524 – INC. 2, AND INC 3
Demolition and construction of a new campus for the Mare Island Technology Academy.
DSA#02-119524- Increment 1: Demolition of existing buildings and construction of a new campus, including site built Multi-Purpose Room, Administration, Science, Soccer Field, Parking Lot and all associated site work and utilities.
DSA#02-119524-Increment 2: Demolition of existing building and construction of a new Gym, Parking Lot and associated site work.
DSA#02-119524-Increment 3: Construction of new modular Classroom Buildings.
Construction Schedule: June 27, 2024-Final Completion: March 31, 2026
Sitework and Building Pads: July – Sept 2024
Waterline Relocation: July 2024
Building Foundations: Sept-Nov 2024
Modular Buildings B, C, F, G, H set : Oct 2024-January 2025
Switchgear Installation/PGE switchover: June 2025
Substantial Completion of Buildings: B, C, F, G, H: July 2025
Substantial Completion of Building J and Parking Lot: July 2025
Substantial Completion of Buildings A, D, E, courtyards and parking lot: December 2025
Upper Campus Demo & Soccer Field Construction: Sept 2025 – Nov 2025
Everest Campus Demo: Jan-Feb 2026
Final Completion: March 31, 2026
Plans & Specs: https://sharesync.serverdata.net/us4/s/Abddb0flWUxghjW3DfZ3Jq003edb50
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
Certificate of Insurance for General Liability, Auto Liability, Excess Liability and Workers' Compensation are required. A waiver of subrogation will also be required with all subcontract agreements for all those lines of business excess. Subcontractors will be required to enter into our standard contract with GMH insurance requirements. All subcontractors/vendors awarded work on this project may have to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).
GMH Builders is available and willing to assist breaking down bid items into economically feasible units for minority participation. We will assist with bonds, lines of credit and insurance if needed.