is seeking certified and qualified DBE and MBE subcontractors and/or suppliers to provide concrete, masonry, steel, carpentry, insulation, roofing, sheet metal, glass and glazing, tile, flooring, painting, fire sprinkler, plumbing, HVAC, electrical, earthwork, and site utilities
Hollywood Burbank Airport Replacement Passenger Terminal: Airline Support Facility
Not Available
Holder Pankow TEC
2827 N. Hollywood Way, Burbank, CA, 91505
06-28-2024 at 02:00 PM
Sally Truong
562-236-5000
562-236-5010
10135 Geary Avenue, Santa Fe Springs, CA, 90670
PROJECT DETAILS:
Scope of Work: Core and shell for a new single-story air cargo and ground support equipment maintenance building (16,000 sf). It will include a triturator, trash enclosure, sunken dock, and other site work accessible parking and localized landscape.
Schedule: 638 Calendar Days
Liquidated Damages: $10,000.00 Per Calendar Day
Prequalification:
All Mechanical, Electrical, and Plumbing subcontractors must be prequalified. Subcontractors that intend to bid as a first-tier subcontractor with the following license classifications must be prequalified: A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and/or C-46.
Insurance Requirements:
This project will be running a Contractor Controlled Insurance Program (CCIP).
Project Labor Specifics: Certified Payroll, Project Labor Agreement requiring 100% union participation. This project has a DBE participation goal of 18%, as well as multiple workforce participation goals: 6.9% female participation, 28.30% minority participation, and 30% local participation (by zip code)
DBE Participation: 18%
RFI Questions and Bid Proposals can be emailed to bid@kempbros.com.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
SUBCONTRACT BOND REQUIREMENTS
KEMP BROS. CONSTRUCTION, INC. (KBCI) may require all subcontractors bidding on projects to provide payment and performance bonds in the amount of 100% of the subcontract value. KBCI will assist with the bond premium up to 1.5% of the original contract amount for the duration of the project. KBCI may waive the bond requirement at its sole discretion. The payment and performance bonds must be issued by an admitted surety within ten (10) business days of the receipt of the Subcontract Agreement from KBCI. KBCI shall be named the obligee and shall guarantee prompt and faithful performance of the subcontract scope of work and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract agreement. When so requested, failure by the Subcontractor to provide the requested 100% payment and performance bonds within the time allowed may be reason for KBCI to request substitution of the Subcontractor in accordance with Section 4107 of the Public Contracting Code.
GENERAL SUBCONTRACTING REQUIREMENTS
KBCI.’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. The subcontractor agrees that its bid will remain valid for the same period of time that KBCI’s bid must remain valid with the owner, as specified in the project’s specifications. Each listed subcontractor must execute KBCI’s standard subcontract agreement if KBCI is awarded the project; the standard subcontract is available for review on KBCI’s website. KBCI is currently using Textura® as its internet-based construction invoicing and payment solution. With Textura® subcontractors can electronically sign and submit pay applications - including invoices, sworn statements, and conditional and/or unconditional lien waivers. It is assumed that any costs for the use of Textura® incurred by the subcontractor(s) are included in the subcontractor’s bid proposal at the time of the bid. Currently the Textura fee is 0.22% of the contract value with a maximum fee of $5,000.00.
If the project is subject to a Project Labor Agreement or Project Stabilization Agreement, Subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements and further agrees to adhere to all of the requirements therein as provided in the bid documents’ General Conditions and Supplemental Conditions.
The State of California requires all contractors bidding or working on any public works project to register with the State Department of Industrial Relations (DIR) and pay an annual registration fee. All contractors awarded a public works contract must be registered with the DIR. Subcontractors providing bids or work without DIR registration will result in a DIR penalty.
SPECIAL NOTICE TO ALL SUBCONTRACTORS
Non-price terms included in competitive bids at bid time, may cause your bid to be rejected as non-responsive. KBCI will not accept any provisions or qualifications in subcontractor bids that are not in the bid documents. By submitting a bid on this project, Subcontractor acknowledges that KBCI is relying on the price terms of your bid and that any non-price terms contrary to or in addition to the provisions in the bid documents are null and void.