is seeking certified and qualified ACDBE, DBE, DVBE, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Work consists of various upgrades at the City of Colusa Wastewater Treatment Plant including installation of a recycled water booster pump station, chlorination system; and connection to the farm field irrigation system, including backflow prevention for the existing irrigation wells and completion of the field drainage systems; also includes construction of a metal maintenance building, installation of a precast concrete recycled water control building, replacement of existing aeration basin equipment, and other miscellaneous improvements at the Colusa WWTP.
2024 Recycled Water System Upgrades Phase 1
C-06-7896-310
City of Colusa
2820 WILL S.GREEN AVENUE, COLUSA, CA 95932, Colusa, CA, 95932
07-30-2024 at 03:00 PM
Harrison Davis
9163958400
916-395-8429
3800 Happy Lane, Sacramento, CA, 95827
PROJECT DETAILS:
Work consists of various upgrades at the City of Colusa Wastewater Treatment Plant including installation of a recycled water booster pump station, chlorination
system; and connection to the farm field irrigation system, including backflow prevention for the existing irrigation wells and completion of the field drainage
systems; also includes construction of a metal maintenance building, installation of a precast concrete recycled water control building, replacement of existing
aeration basin equipment, and other miscellaneous improvements at the Colusa WWTP.