Trade Journal

Nicholas Construction, Inc.

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, SURVEYING, TRAFFIC CONTROL PLANS AND IMPLEMENTATION, SIGNAGE, TRUCKING, SWEEPING, CLEARING AND GRUBBING, DEMOLITION, POTHOLING, ROADWAY AND DRIVEWAY PAVING, EARTHWORK, SOILS AND COMPACTING TESTING, TRENCHING, SHORING, WATERWORKS EQUIPMENT AND MATERIALS, FITTINGS, PRESSURE AND LEAK TESTING, AGGREGATE MATERIALS, READYMIX AND GENERAL CONCRETE WORK, DOMESTIC SERVICE CONNECTIONS


PROJECT NAME:

PHASE 2 PIPELINE REPLACEMENT PROJECT

BID CONTRACT #:

Not Available

AWARDING AGENCY:

LINDSAY-STRATHMORE IRRIGATION DISTRICT

PROJECT LOCATION:

VARIES, 9 SITES THROUGHOUT LINDSAY AND STRATHMORE, CA, LINDSAY/STRATHMORE, CA, 93247

BID DUE DATE:

08-02-2024 at 11:00 AM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.

All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available BY EMAIL REQUEST TO ALEX@NICHOLASCONSTRUCTIONINC.COM.

The major work consists of installation of approximately 2.5 miles of irrigation/water pipeline at 9 separate locations (4 main bid and 5 alternate bid), ranging in size from 24" down to 4" PVC, including all necessary valves, fittings, connections to irrigation and hydrant laterals, and approximately 4000 square feet of roadway and driveway reconstruction.

We will assist with Bonds, Lines of Credit and Insurance if needed. Plans & specs available to view in our office.

Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Plans available from owner or are available for review at our office in 7-DAYS prior to bid day.

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).

Social Media

Copyright © 2024 Compliance News All rights reserved.