Trade Journal

ProWest Constructors

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide SWPPP monitoring and implementation, final clean, surveying, demolition, reinforcing steel, cast-in-place concrete, masonry, structural steel, metal deck, handrails and railings, decorative metal, rough carpentry, finish carpentry, cabinets and millwork, FRP, waterproofing, insulation, built up roofing, sheet metal flashing and trim, metal siding and composite wall cladding, doors, frames, hardware, glass, storefront and curtain walls, drywall and metal studs, lath and plaster, ceramic tile, acoustical ceilings, carpet and resilient flooring, resinous and epoxy flooring, painting, visual display boards, signage, toilet partitions, wall and corner guards, bathroom accessories, fire extinguishers and cabinets, projection screens, theatrical lighting and rigging, stage curtains, fall arrest systems, window coverings, wheelchair lifts, plumbing, HVAC and controls, electrical, communications, audio visual, fire alarm system, intrusion detection, earthwork, ac paving, site concrete, pavement striping, fences and gates, landscape and irrigation, site utilities


PROJECT NAME:

Elsinore Elementary School MPR Modernization Increment 2

BID CONTRACT #:

01-24/25

AWARDING AGENCY:

Lake Elsinore Unified School District

PROJECT LOCATION:

512 W. Sumner Ave, Lake Elsinore, CA, 92530

BID DUE DATE:

07-10-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

This project entails the renovation of the existing 6,550-square-foot Multipurpose Room (MPR) building at Lake Elsinore Elementary School. The scope of work includes comprehensive site concrete and landscaping improvements, reconfiguration and resurfacing of the parking lot to enhance traffic flow and safety, and electrical upgrades to support modern educational technology. The project also involves the installation of a new roofing system, seismic upgrades involving new footings and structural steel, a new HVAC system, modernized restrooms, and extensive interior finish enhancements. Additionally, a new shade structure and an ADA-accessible ramp will be constructed.

Social Media

Copyright © 2024 Compliance News All rights reserved.