is seeking certified and qualified DBE subcontractors and/or suppliers to provide Item 1- Clear & Grubbing, Demo, Excavation, Backfill, Grading, Compaction, Balance Roadway/Site to New Grade Item 2- Haul Off Site Excess Material Item 3- Cold Plane 3” Existing AC Surface and Haul Off Site Item 4- Cement Treated Subgrade- Pulverize Existing Material & Mix with 3% Cement, water & Compact Item 5- Class II Aggregate Base Item 6- HMA Type A Item 7-10- Misc Concrete Item 11- Remove Existing Striping Item 12- 17 Thermoplastic Striping Item 18- Furnish & Install Solar Powered Flashing LED Stop Sign Item 19-26- Furnish & Install Signs Item 27- Adjust/Relocate Signs Item 28-29- QCP and WPCP Item 30- Temporary Traffic Control ** Also requesting Asphalt, Concrete, Thermoplastic Paint, and Sign DBE Supplier Quotes** ** All Items can be broken down by supplier and install**
Hacienda Blvd Rehabilitation
STPL-5399(033)
City of California City
Manzanita Ave to Redwood Blvd, City of California City, CA, 93505
07-11-2024 at 02:00 PM
Joe Archuleta
(661) 618-6906
661-424-7815
PO Box 71377 , Bakersfield, CA, 93387
PROJECT DETAILS:
Bid documents and addendums can be obtained from:
BHT Engineering, Inc. 218 S. H Street, Suite 201 Bakersfield, CA 93304
No Cost Electronic Download Available by Contacting Juan Pantoja at 661-558-4641 or juan@bhtengineering.com
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to hold a valid contractors license as well as current Liability, Commercial Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage DBE certified firms to contact Westrock General Engineering to learn what assistance we can provide to you such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical assistance and services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents. Subcontractor and Supplier bids are required by 5:00 PM July 10, 2024.
PDF ATTACHMENTS: