Trade Journal

Granite Rock Company

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide All bid items are available particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Striping & Marking, Portable Radar Speed Feedback System, PCMS, Temporary Barrier System, Temporary Pedestrian Access Route, Temporary Crash Cushions, Temporary Traffic Screens, Water Pollution Control System, Street Sweeping, Temporary Radar Speed Feedback Sign System, Temporary Drainage Inlet Protection, Temporary Tree Protection, Clearing and Grubbing, Noise Monitoring, Erosion Control w/ Hydroseed, AC Dike, Tack Coat, Pipe, Bridge Removal, Anchor Assembly, Misc. Iron and Steel, Misc. Metal, Midwest Guardrail System, Guard Railing Delineator, Alt. Inline Terminal System, Signs, Railing, Electrical, and Trucking.


PROJECT NAME:

CONSTRUCTION ON STATE HIGHWAY IN SANTA CLARA COUNTY IN LOS GATOS AT SANTA CRUZ AVENUE UNDERCROSSING AND AT MAIN STREET OVERCROSSING

BID CONTRACT #:

Contract No. 04-0P9704

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Los Gatos, CA

BID DUE DATE:

08-08-2024 at 02:00 PM

OUTREACH COORDINATOR:

David Kennedy

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company ‘Graniterock’ is signatory to Operating Engineers, Laborers, Teamsters, Carpenters, and Cement Masons unions. Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite 220, San Jose, or electronically at Caltrans Office Engineer website http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. 100% payment and 100% performance bonds in the amount of the subcontractor’s bid will be required from a qualified surety company. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. SBE/DVBE Subcontractors must be listed by the CUCP for the work code(s) that apply to the scope of work they are quoting. Graniterock will break down items of work to facilitate SBE/DVBE participation. Graniterock intends to work cooperatively with all qualified SBE/DVBE firms seeking work on this project. Granite Rock Company is an Equal Opportunity Employer.

Social Media

Copyright © 2024 Compliance News All rights reserved.