is seeking certified and qualified DBE subcontractors and/or suppliers to provide Subcontractor- Dewatering, Contaminant Survey, Landscaping, Temp Sound Barrier, Fencing/Guardrail, Traffic Control, Minor Concrete, Minor Concrete Structures, Prestressed Concrete, CIDH Piles, Reinforcing Steel, Retaining Walls, Architectural Treatment, Demolition, Trucking, Asphalt Paving, Asphalt Dikes, Cold Milling, Electrical, Clear & Grub, Sawcutting, Hydroseed/Hydromulch, Signage & Striping Chlorination, Shoring, Cathodic Protection, Electrical & Instrumentation, Concrete Scanning, Biological Monitoring, Street Sweeping, Surveying, Quality Control. Suppliers- Ready Mix Concrete, Dowels, Joint Seal, Aggregates, Geogrid, Geotextiles, Misc. Metals, Softstop Terminal 8” Block, RCP, Concrete Lug, Modular Wetland System, BMP Materials, Traffic Control Materials, Shoring, Cement Mortar Lined pipe, Polyurethane Coated pipes, Valves, Waterworks, Pipe Supports.
Heritage Road Bridge Replacement & Main Street
STM386 & STM388
City of Chula Vista
Heritage Rd and Main Street, Chula Vista, CA, 91913
09-04-2024 at 02:00 PM
Brenda Martinez
909-622-2259
Not Available
1383 South Signal Dr., Pomona, CA, 91766
PROJECT DETAILS:
Project Scope:
The Project intel’s removal of existing bridge over Otay River and replacement with a new 454-ft long, 130-ft wide bridge providing six-lane prime lane geometry including a raised median, dual northbound left-turn lanes, buffered bike lanes, vehicular barriers rated M.A.S.H. TL-3, six-foot wide sidewalks, roadway lighting, and pedestrian railings. Three-span variable depth haunched concrete box girder design supported by high seat abutments over 36-inch cast in drilled hole (CIDH) piles featuring wing walls and 78-inch CIDH piles. The new bridge, wing walls, grading, rock slope protection, a portion of the drainage system, and headwall outfall adjacent to rock slope protection. Heritage Road will be realigned, widened to provide six-lane prime geometry, and reprofiled matching the new bridge. The scope of work consists of roadway, bicycle, ADA pedestrian, drainage, water quality, landscape, and irrigation improvements. Guardrails and M.A.S.H. rated end terminals will be installed on bridge approaches. Traffic improvements along Heritage Road include roadway markings featuring buffered bike lanes, roadway signage, street lighting, signalization of the intersection at Entertainment Circle North, a signal modification at Main Street, and signal interconnect.
Estimated Project Value: $48-53.5M
DBE Goal: 21%
Assistance will be available in obtaining bonds, lines of credit,
insurance, necessary equipment, supplies,
materials or related technical assistance.
For information on the availability of scope of work, plans, and specifications, please contact our office.
Plans, Specifications, and Contract requirements can be viewed online at no additional cost:
1) Via Construct Connect – please send an email request to estimating@reyesconstruction.com
2) PlanetBids- City of Chula Vista