The Truesdell Corporation

is seeking certified and qualified DBE subcontractors and/or suppliers to provide PAVEMENT MARKING REMOVAL; CONCRETE GRINDING; PORTABLE PRECAST CONC BARRIER DES 8337; RELOCATE PORT PRECAST CONC BAR DES 8337; TRAFFIC CONTROL; ALTERNATE PEDESTRIAN ROUTE; RAISED PAVEMENT MARKER TEMPORARY; PORTABLE BARRIER DELINEATOR; AUD MESS DEV W PUSHBUTTON & LOCATOR TONE; TEMPORARY IMPACT ATTENUATOR; RELOCATE TEMPORARY IMPACT ATTENUATOR; STORM DRAIN INLET PROTECTION; 4" REMOVABLE PREFORM PAVEMENT MARKING TAPE WR; 6" REMOVABLE PREFORM PAVEMENT MARKING TAPE WR; 8" REMOVABLE PREFORM PAVEMENT MARKING TAPE WR; 4" SOLID LINE PAINT (WR); 4" BROKEN LINE PAINT (WR); 6" SOLID LINE MULTI COMP (WR); 10" SOLID LINE MULTI COMP (WR); 4" BROKEN LINE MULTI COMP (WR); 10" DOTTED LINE MULTI COMP (WR); 6" SOLID LINE MULTI COMP GR IN (WR); 4" SOLID LINE PREF TAPE (WR); 4" DOTTED LINE PREF TAPE (WR); 4" BROKEN LINE PREF TAPE GR IN (WR) CONT; 10" DOTTED LINE PREF TAPE GR IN (WR) CONT; PREMIXED POLY CONC (PPC) WEARING COURSE; RECONSTRUCT CONCRETE BARRIER; CLEAN & SEAL DECK JOINTS; WC SURFACE PREP SPECIAL


PROJECT NAME:

MNDOT; Br. #82856 & #82855, Traffic Contrl

BID CONTRACT #:

22032

AWARDING AGENCY:

Minnesota Department of Transportation

PROJECT LOCATION:

Mississippi River Bridge, Dakota and Washington Counties, MN, 55454

BID DUE DATE:

03-25-2022 at 09:30 AM

OUTREACH COORDINATOR:

Patrick Lambson

TELEPHONE:

Not Available

FAX:

6024371821

ADDRESS:

1310 W. 23rd Street, TEMPE, AZ, 85282

PROJECT DETAILS:

Truesdell Corporation of Wisconsin is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.  Truesdell Corporation of California, Inc. is a union signatory contractor.  Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies.  Please contact us should you need assistance in obtaining the plans, specifications and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation of Wisconsin Standard Subcontract Agreement.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.