Kemp Bros. Construction, Inc.

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide concrete, masonry, steel, carpentry, insulation, roofing, sheet metal, glass and glazing, tile, flooring, painting, fire sprinkler, plumbing, HVAC, electrical, AC paving, earthwork, and site utilities


PROJECT NAME:

Lynwood High School New Classroom Building

BID CONTRACT #:

Bid #02May24-DN

AWARDING AGENCY:

Lynwood Unified School District

PROJECT LOCATION:

4050 Imperial Hwy., Lynwood, California 90262, Lynwood, CA, 90670

BID DUE DATE:

08-08-2024 at 09:00 AM

OUTREACH COORDINATOR:

Sally Truong

TELEPHONE:

562-236-5000

FAX:

562-236-5010

ADDRESS:

10135 Geary Avenue, Santa Fe Springs, CA, 90670

PROJECT DETAILS:

Kemp Bros. Construction is competitively bidding Lynwood High School New Classroom located at 4050 Imperial Hwy., Lynwood, California 90262.

 

Project Description: The Project is a 3-story 156,384 square-foot facility with 71 classrooms.  The classroom count includes a kiln/multi-use building.  The classroom's main structure is a steel moment frame with sideplate connections and metal stud infill framing.  The kiln/multiuse building is a CMU structure with steel moment frame infill.  The main structure exterior includes architectural aluminum panels at overhangs and selected window openings and storefront window systems.  The lightwell gathering space includes fire curtains.  Interiors include corridors, two (2) elevators, fire-rated wall and ceiling assemblies, and sealed concrete floors.  Sitework improvements include exterior walls and fences throughout, several standalone canopies with metal cladding, landscaping, hardscape, concrete benches, irrigation, fire lane replacement, and re-routing of miscellaneous site utilities. 

 

Deferred Approval Items: The general contractor will be responsible for completing the design and obtaining DSA approval for the following deferred approval items: (i) curtain wall systems; (ii) storefronts or windows over 10’0” in height; (iii) translucent skylights; and (iv) elevator guide rails.

 

Prevailing Wage: Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates can obtained online at http://www.dir.ca.gov.

 

Wage Rate: (I) CA State Prevailing Wage rates and Certified Payroll apply (II) For trades utilizing carpenters for field installation- Union Wage rate will apply (Kemp Brothers is signatory to the Carpenter’s Union Only).

 

CWA: The Work is subject to the Community Workforce Agreement (“CWA”) between the District and the Los Angeles/Orange Counties Building and Trades Council.  Each Bidder must submit the completed and executed CWA Letter of Assent concurrently with submitting its Bid Proposal.  All Subcontractors must complete and execute the CWA Letter of Assent as a condition to performing any Work.   

 

Project Schedule: (912) calendar days, NTP September 2024

 

Liquidated Damages:

$1,500 – Deferred Approval Submittals

$1,500 – Structural Steel SD

$1,500 – Critical Submittals

$5,000 – Deep soil mixing 

$2,500 – Fire Lane Completion

$500 – Submittals per baseline

$3,000 – 1-7 days substantial completion

$4,000 – 8-14 days substantial completion

$5,000 – 15-21days substantial completion

$6,000 – 22-28 days substantial completion

$7,000 – More then 29 days substantial completion

$2,000 – Punchlist Items

 

SUBCONTRACT BOND REQUIREMENTS

KEMP BROS. CONSTRUCTION, INC. (KBCI) may require all subcontractors bidding on projects to provide payment and performance bonds in the amount of 100% of the subcontract value. KBCI will assist with the bond premium up to 1.5% of the original contract amount for the duration of the project. KBCI may waive the bond requirement at its sole discretion. The payment and performance bonds must be issued by an admitted surety within ten (10) business days of the receipt of the Subcontract Agreement from KBCI. KBCI shall be named the oblige and shall guarantee prompt and faithful performance of the subcontract scope of work and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract agreement. When so requested, failure by the Subcontractor to provide the requested 100% payment and performance bonds within the time allowed may be reason for KBCI to request substitution of the Subcontractor in accordance with Section 4107 of the Public Contracting Code.

GENERAL SUBCONTRACTING REQUIREMENTS

KBCI’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. The subcontractor agrees that its bid will remain valid for the same period that KBCI’s bid must remain valid with the owner, as specified in the project’s specifications. Each listed subcontractor must execute KBCI’s standard subcontract agreement if KBCI is awarded the project; the standard subcontract is available for review on KBCI’s website. KBCI is currently using Textura® as its internet-based construction invoicing and payment solution. With Textura® subcontractors can electronically sign and submit pay applications - including invoices, sworn statements, and conditional and/or unconditional lien waivers. It is assumed that any costs for the use of Textura® incurred by the subcontractor(s) are included in the subcontractor’s bid proposal at the time of the bid. Currently, the Textura fee is 0.22% of the contract value with a maximum fee of $5,000.00.

If the project is subject to a Project Labor Agreement or Project Stabilization Agreement, the Subcontractor, by submitting a bid proposal, acknowledges the requirements of such agreements and further agrees to adhere to all of the requirements therein as provided in the bid documents’ General Conditions and Supplemental Conditions.

The State of California requires all contractors bidding or working on any public works project to register with the State Department of Industrial Relations (DIR) and pay an annual registration fee. All contractors awarded a public works contract must be registered with the DIR. Subcontractors providing bids or work without DIR registration will result in a DIR penalty.

SPECIAL NOTICE TO ALL SUBCONTRACTORS

Non-price terms included in competitive bids at bid time may cause your bid to be rejected as non-responsive.  KBCI will not accept any provisions or qualifications in subcontractor bids that are not in the bid documents. By submitting a bid on this project, Subcontractor acknowledges that KBCI is relying on the price terms of your bid and that any non-price terms contrary to or in addition to the provisions in the bid documents are null and void.

 

Kemp may require a bond, include your bond rate on your proposal.  If required, Kemp will assist in obtaining bonds up to 1.5% of the bond invoice of the original contract amount for the duration of the project.  Kemp may assist minority bidders in obtaining bonding, insurance, or equipment.  Plans, specifications, and all IFB Documents are available by contacting Kemp at bid@kempbros.com or (562) 236-5000.  A copy of Kemp’s Standard Subcontract Agreement is also available for review on Kemp’s website at www.kempbros.com.

 