Trade Journal

ProWest Constructors

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Misc. Metals, FRP, Fabric Wrapped Wall Panels, Shoring, SWPPP, Final Cleaning, Surveying, Reinforcing Steel, CIP Concrete, Sealed and Polished Concrete, Masonry, Structural Steel, Metal Deck, Handrails and Railings, Rough Carpentry, Cabinets and Millwork, Waterproofing, Insulation, Roofing, Metal Roofing, Sheet Metal Flashing and Trim, Fireproofing, Doors, Frames, Hardware, Overhead Doors, Glass and aluminum, Drywall, Lath and Plaster, Ceramic Tile, Acoustical Ceilings, Carpet, Flooring, Wall Covering, Paint, whiteboards, signage, cubicle curtains, fire extinguishers and cabinets, food service equipment, projection screens, window coverings, shade structures, elevators, fire sprinklers, plumbing, HVAC, electrical, communications, audio visual, fire alarm system, intrusion detection, earthwork, ac paving, site concrete, striping, fences, landscape and irrigation, site utilities


PROJECT NAME:

Lynwood High School Imperial Campus New Classroom Building

BID CONTRACT #:

02MAY24-DN

AWARDING AGENCY:

Lynwood Unified School District

PROJECT LOCATION:

4050 East Imperial Highway, Lynwood, CA, 90262

BID DUE DATE:

08-08-2024 at 10:00 AM

OUTREACH COORDINATOR:

Alicia Daniel

TELEPHONE:

9516781038

FAX:

9516781083

ADDRESS:

22710 Palomar Street, Wildomar, CA, 92595

PROJECT DETAILS:

PROJECT DESCRIPTION:

The project is a 3-story 156,384 square foot facility with 71 classrooms. The classroom count includes a kiln/multiuse building. The classroom main structure is a steel monument frame with side plate connections and metal stud infill framing. The kiln/multiuse building is a CMU structure with steel moment frame infill. The main exterior includes architectural metal panels at overhangs at selected window openings and storefront window systems. The lightwell gathering space includes skylights, and fire curtains. Interiors include tackable wall systems marker boards, casework, and two (2) elevators. Site work includes an amphitheater and fences, several standalone canopies with metal cladding, landscaping, hardscape, concrete benches, irrigation, fire lane replacement and re-outing of miscellaneous site utilities.

Deferred Approval Items The general contractor will be responsible for completing design and obtaining DSA approval for the following deferred approval items: (i) curtain wall system; (ii) storefronts or windows over 10’0 in height; (iii) translucent skylights; and (iv) elevator guiderails.

Social Media

Copyright © 2024 Compliance News All rights reserved.