Trade Journal

Granite Rock Company

is seeking certified and qualified DBE and SBE subcontractors and/or suppliers to provide all bid items, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Portable Changeable Message Sign, Temporary Crash Cushion, SWPPP, Temporary Erosion Control, Storm Water Sampling & Reports, Street Sweeping, Asbestos Compliance Plan, Treated Wood Waste, Temporary Fence, Clearing & Grubbing, Structure Excavation & Backfill, Landscape, Wood Mulch, Erosion Control, Hydroseed, AC Dike, Tack Coat, CIDH Concrete Piling, Minor Concrete, Joint Seal, Rebar, Sign Structures, Misc. Iron & Steel, Rock Slope Protection, Bridge Deck Drainage System, Destroy Well, Prepare & Stain Concrete, Fence & Gate, Pavement & Object Marker, Concrete Barrier Delineator, Midwest Guardrail System, Tubular Bicycle Railing, Single Thrie Beam Barrier, Cable & Transition Railing, Alternative In-Line Terminal System, Concrete Barrier, Striping, Rumble Strip, Electrical, Wick Drains, Structural Concrete Bridge / Retaining Wall, Geo Grid, Geosynthetics, Demolition Building / Bridge and Trucking


PROJECT NAME:

US 101 / SR 25 Phase I Improvements Project

BID CONTRACT #:

C24121

AWARDING AGENCY:

Santa Clara VTA

PROJECT LOCATION:

Gilroy, CA

BID DUE DATE:

08-16-2024 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Plans and Specifications are available in our Estimating Office located at 5225 Hellyer Avenue, Suite #220, San Jose, CA 95138. Graniterock is signatory to Operating Engineers, Laborers, Teamsters, Cement Masons and Carpenters unions. 100% payment and 100% performance bonds in the amount of the subcontractors bid will be required from a qualified surety company. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. Subcontractors must possess a current contractor’s license, DIR number, insurance and worker’s compensation coverage. Graniterock will break down items of work to facilitate SBE & DBE Firms participation.

Social Media

Copyright © 2025 Compliance News All rights reserved.