PINMOR CONSTRUCTION LLC

is seeking certified and qualified DBE, DVBE, Los Angeles County LSBE, MBE, SBE, WBE and LSEDV subcontractors and/or suppliers to provide Haz Mat Abatement, Assume Asbestos Containing Materials ACM at all whiteboards, ceiling tiles, plaster as well as multiple layers of ACM floor tiles. Demo of structures, asphalt, concrete, shrubs, and trees, both above and below grade. Clear, grub and scarify the entire site, Install new landscape, planting, trees, irrigation and walkway. Protect and repair adjacent landscape planting, irrigation and walkways. Protect trees that are called out to remain. Terminate, cap of, or reroute utilities, including fire alarm, electrical, sewer and gas. Provide topographical survey. This is a non-DSA project.


PROJECT NAME:

Demo Bungalows 80-85 Los Angeles Valley College (LAVC)

BID CONTRACT #:

PQ-22-04-V | Proj ID No. 08V-879.08

AWARDING AGENCY:

BuildLACCD | Los Angeles Community College District

PROJECT LOCATION:

5800 Fulton Avenue, Van Nuys, CA, 91401

BID DUE DATE:

04-06-2022 at 10:00 AM

OUTREACH COORDINATOR:

Johnny Pinner

TELEPHONE:

Not Available

FAX:

7148804828

ADDRESS:

7312 Walnut Ave, Buena Park, CA, 90620

PROJECT DETAILS:

Bidders should note that Los Angeles Community College District (LACCD) requires the mechanical, electrical, and plumbing contractors (MEP subcontractor trades) to be fully licensed and experienced with Class B, or C-10. This requires they be competent, been in business with similar project experience approved by the Division of State Architect (DSA) with a construction value of $5 Million, and with experience on similar systems, and products and test methods. This includes UL safety standards, NEC, and NESC applicable background prior to bid. Further, there is mandatory use of District Pre-Qualified Subcontractors in the following areas: Audio Visual Integrators; Structured Cabling Contractors, and Physical Security Integrator/Installers. Please see Specification for full detail.

This project is subject to the Community Economic Development Pogram (CED Program) to maximize local economic benefits generated by the LACCD Bond Program. There is a District inclusion program, in which PINMOR CONSTRUCTION LLC will be actively seeking district goals to include Local, Small, Emerging and Disabled Veteran (LSEDV) business to meet the percentage goal requirments of 30%. Again, please see Specifications for full Detail.

This project is also subject to contractor compliance monitoring and enforcement by the District Labor Compliance Program. There is also a Project Labor Agreement (PLA) that the District negotiated and entered into with the Los Angeles/Orange County Building and Trades Council and Southwestern Regional Council of Carpenters. The PLA establishes the labor relations policies and procedures for the District, contractors, and craft employees engaged inn the Build Program.  There is also a Local & Disadvantaged Local, and Veteran Worker Participation program with goals set forth in the PLA that contracted subcontractors and contractors will be required to participate in. The PLA requires that contractors make a good faith effort to hire local workers to perform 35% of all skilled trade positions, and further that Disadvantaged Local Workers perform at least 10% of those skilled trade positions. Local Workers from the Primary Residency Preference will be sought first, with Local Workers from the Secondary Residency Preference Areas following. Please review all Specification Requirements carefully. 

Selected contractual Bidder, and an/all contracted subcontractors and tier contractors,will be required to participate in District mandatory Owner Controlled Insurance Program (OCIP) on this project; There are specifric safety EMR eligibility requirements to be able to participate.

Please read all Specifications and General & Supplemental Conditions carefully.

Time of completion is 75 Calendar Days.  Project Engineered Estimate is approximately $ 600,000.

RFI's are due by March 23rd 2022, before 2:00 PM

All Trades are expected to be bondable and prepared to furnish 100% Payment and Performance Bonds from an admitted surety for their bid. [Bond Premium costs are to be included in your bid as a separate item.] This form wil, at ouor sole discretion, reserve the right to waive the above requirements for such bond and to permit other security as a substitute, or to accept alternate guraanteein lieu of. We will help assist interested subcontractors in Bonding, Lines of Credit, and Insurance needs, if required. However4, please contract us prior to our bid date to discuss. We will negotiate in good faith for all trade selections. Subcontractors/Su[ppliers selected will be required to agree to, and sign, our standar MasterSubcontractor Agreement (including payment terms) a copy of which is available out our offices. No modifications to the contract will be permitted.

Hard copies of plans and specs are avilable for revie/takeoff at our main office during regular business houors,M-F, 7:30am -4:30 pm.

                                             WE ARE AN EQUAL OPPORTUNITY EMPLOYER 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.