is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BID PACKAGE #04 – DEMOLITION, DIV. 3 CONCRETE, CONCRETE FLOOR FINISHES, FINISH CARPENTRY, ARCHITECTURAL WOOD CASEWORK, FIBERGLASS REINFORCED PANELING, COMMON WORK RESULTS FOR FLOORING PREP, TILING, ACOUSTICAL CEILINGS, RESILIENT FLOORING, TILE CARPETING, ARCHITECTURAL VINYL GRAPHIC FILMS, RESILIENT TACKABLE WALL COVERING, EXTERIOR PAINTING, INTERIOR PAINTING, HIGH-PERFORMANCE COATINGS, GRAFFITI-RESISTANT COATINGS, VISUAL DISPLAY UNITS, PANEL SIGNAGE, PLASTIC TOILET COMPARTMENTS, WALL AND DOOR PROTECTION, TOILET ACCESSORIES, MURAL PIANTING, COUNTERTOPS, SITE CLEARING, GRADING, SITE CONCRETE, ASPHALT PAVING, SEAL COATS, PAVEMENT MARKINGS, CHAIN LINK FENCES AND GATES, FINAL CLEANING, GPR SURVEY, SURVEYING, SWPPPs/BMPs, TEMPORARY SERVICES, TEMPORARY FACILITIES
Glen View High School New Classroom Building
2024-25-01
Beaumont Unified School District
939 E. 10th Street, Beaumont, CA, 92223
08-20-2024 at 02:00 PM
Ashley Krastev
(657) 231-6230
(657) 231-6646
1571 Parkway Loop, Suite B , Tustin, CA, 92780
PROJECT DETAILS:
PLANS & SPECS AVAILABLE THROUGH DROPBOX LINK BELOW:
When inquiring about this bid please also include the following email on correspondence:
Estimating@RVHConstructors.com