is seeking certified and qualified MBE and WBE subcontractors and/or suppliers to provide 02 21 13 Construction Surveying 02 41 13 Selective Site Demolition 02 83 13 Lead Hazard Control Activities 02 84 13 PCB Hazard Control Activities 03 11 00 Concrete Forming 03 15 00 Concrete Accessories 03 15 14 Hydrophilic Rubber Waterstop 03 20 00 Concrete Reinforcing 03 21 17 Epoxy Bonding Reinforcing Bars and All Thread Rods in Concrete 03 30 00 Cast-in-Place Concrete 03 35 00 Concrete Finishing 03 39 00 Concrete Curing 03 48 00 Precast Concrete Specialties 03 60 00 Grouting 03 62 19 Repair Mortar 03 63 01 Epoxies 03 63 02 Epoxy Resin/Portland Cement Bonding Agent 05 05 14 Hot-Dip Galvanizing 05 05 19 Mechanical Anchoring to Concrete and Masonry 05 05 24 Shop and Field Welding 05 05 26 Flange Bolting 05 50 00 Metal Fabrications 06 10 53 Miscellaneous Rough Carpentry 07 12 00 Bituminous Waterproofing 07 19 00 Water Repellents 07 53 00 Elastomeric Membrane Roofing 07 60 00 Flashing and Sheet Metal 07 92 00 Joint Sealants 08 31 05 Access Hatches and Vault Hatches 08 34 73 Sound Control Door Assemblies 08 71 00 Door Hardware 08 91 00 Louvers 09 84 10 Acoustical Panels 09 91 00 Painting 09 96 00 High-Performance Coatings 10 44 00 Fire Protection Specialties 12 31 01 Shop Furniture 22 05 53.05 Pipe Identification 22 13 16 Sanitary Waste and Vent Piping 22 30 00.01 Plumbing Fixtures and Equipment 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 82 19 Fan Coil Units 26 05 00 Common Work Results for Electrical 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 83 Low Voltage Motors 26 08 00 Commissioning of Electrical Systems 26 09 13 Electrical Power Monitoring and Control 26 09 23 Lighting Control Devices 26 22 13 Low-Voltage Distribution Transformers 26 24 13 Switchboards 26 24 16 Panelboards 26 24 19 Motor Control Centers 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 29 13.13 Across-The-Line Motor Controllers 26 29 13.16 Reduced Voltage Motor Controllers 26 51 13 Interior and Exterior Lighting Fixtures 26 52 00 Emergency Lighting 26 53 00 Exit Signs 27 05 00 Common Work Results for Communications 27 08 00 Commissioning of Communications Systems 27 15 13 Communications Copper Horizontal Cabling 27 60 13 Exterior Antenna Systems 28 10 01 Access Control System Expansion 31 11 00 Clearing and Grubbing 31 23 16 Excavation 31 23 19 Dewatering 31 23 23 Fill 31 23 23.15 Imported Backfill and Drain Rock Materials 31 23 23.34 Controlled Low Strength Material 31 32 19.25 Geosynthetic Filter Fabric 31 50 00 Excavation Support and Protection 32 12 16 Asphalt Concrete Paving 32 12 16.81 Asphalt Pavement Replacement 32 31 13.13 Chain Link Fence and Manual Gates 32 92 19.16 Hydraulic Seeding 33 05 24.45 Commercial Steel Civil Pipe 33 05 97.25 Tracer Wire for Non-Metallic Underground Utility 33 09 11 Instruments and Recorders 33 10 01 Protection from Corrosion 33 11 03.01 Manufacture of AWWA Steel Pipe Cylinders and Fabrication of Steel Pipe Specials 33 11 06 Fabricated Pipe Specials 33 11 07 Specialty Couplings for Mechanical Piping 33 11 08 Flexible Ball-Type Expansion Joints 33 11 13 General Pipeline Installation Requirements 33 11 13.05 Installation of Steel Pipe 33 11 13.10 Polywrap 33 11 13.50 Mortar Lining for Steel Pipe 33 11 13.60 Mortar Coating for Steel Pipe 33 11 13.62 Dielectric Coatings for Steel Pipe 33 11 13.80 Cellular Concrete for Filling Abandoned Pipes 33 12 01 Basic Mechanical Materials and Methods 33 12 16.05 Miscellaneous Valves 33 12 16.11 Resilient-Seated Gate Valves 33 12 16.15 AWWA Butterfly Valves 33 12 16.16 High Performance Butterfly Valves 33 12 16.22 Wafer Style Swing Check Valves 33 12 16.25 Automatic Diaphragm Actuated Valves 33 12 16.32 Electric Motor Valve Actuators 33 12 16.52 Pumping Plant Surge/Relief Valve Systems 33 12 23.10 Vertical Turbine Pumps 33 12 27.11 Strainers and Filters 33 12 28.11 Miscellaneous Piping Specialties 33 41 16.16 Geocomposite Subdrainage 33 46 16 Subdrainage Piping 33 71 19 Electrical Underground Ducts and Manholes 40 01 50 Supplemental Operations and Maintenance Manual Requirements for Process Integration 40 05 00 Common Work Results for Process Integration 40 20 20 Mechanical Piping 40 80 00 Commissioning of Process Systems 40 90 00 Instrumentation and Control for Process Systems 40 94 33 Operator Interface Terminals 40 94 43 Programmable Logic Process Controllers 40 95 13 Process Control Panels and Hardware 40 95 33 Process Control Networks 40 96 35 Process Control Software Programming 41 22 13.13 Overhead Bridge Crane
Fay Hill Pumping Plant Replacement; Rheem and Scenic East Pumping Plants Improvements, and Fay Hill Road and Right of Way 3363 Pipeline Improvements; and Ridgewood Regulator Installation, Pumping Plant & Pressure Tank Demolition
Specification 2183
East Bay Municipal Utility District
341 Rheem Blvd. and 16 Roberts Ct., Moraga and Danville, CA, 94556 and 94526
09-11-2024 at 01:30 PM
Kelsey Heaphy
4154568972
415-459-0665
5400 Hanna Ranch Road, Novato, CA, 94945
PROJECT DETAILS:
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/o0j6kck4hlpesh8zauwlywa14c024i6n
Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Kelsey Heaphy
PHONE: (415) 456-8972 FAX: (415) 459-0665