Trade Journal

Nicholas Construction, Inc.

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, SURVEY, SOILS TESTING, TEMPORARY WATER SUPPLY, TEMPORARY FACILITIES, DEMO WORK, TRUCKING AND MATERIAL HAULING, POTHOLING, CLEARING AND GRUBBING, SWEEPING, EARTHWORK, GRADING, CONCRETE CANAL LINING, READYMIX AND GENERAL CONCRETE WORK, SCREEDING, REINFORCING STEEL, MISCELLANEOUS METALS


PROJECT NAME:

CALLOWAY CANAL LINING: SNOW ROAD TO 7TH STANDARD ROAD

BID CONTRACT #:

NK 621

AWARDING AGENCY:

North Kern Water Storage District

PROJECT LOCATION:

Calloway Canal, Snow Rd to 7th Standard Rd, Bakersfield, CA, 93314

BID DUE DATE:

10-08-2024 at 02:00 PM

OUTREACH COORDINATOR:

Alex Silicz

TELEPHONE:

661-619-7417

FAX:

Not Available

ADDRESS:

251 Carsen Way, Shafter, CA, 93263

PROJECT DETAILS:

We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by email request to alex@nicholasconstructioninc.com 

The majority of work consists of re-shaping and constructing approximately 6,056 LF of existing canal section extending from the existing lined canal section starting at the north side of Snow Road at the end of the existing concrete lined section, running north to the existing concrete canal lining south of 7th Standard Road, which includes subgrade preparation, relocation of fill dirt, placement, compaction, and grading of fill as well as approximately 5,956 LF of concrete lining, and removal and stockpile of rip-rap from the canal prism section. 

We will assist with Bonds, Lines of Credit, and Insurance if needed. Plans & specs available to view in our office.

Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).

Social Media

Copyright © 2024 Compliance News All rights reserved.