Trade Journal

Granite Rock Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide all bid items are available, particularly these: Lead Compliance Plan, Construction Area Signs, Traffic Control, Stationary Impact Attenuator Vehicle, Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Barrier System, Portable Changeable Message Sign, Temporary Crash Cushion, SWPPP, Temporary Erosion Control, Storm Water Sampling & Reports, Street Sweeping, Treated Wood Waste, Temporary Fence, Clearing & Grubbing, Structure Excavation & Backfill, Landscape, Wood Mulch, Irrigation, Erosion Control, Hydroseed, AC Dike, Tack Coat, CIDH Concrete Piling, Joint Seal, Rebar, Sign Structures, Prepare Concrete Bridge Deck Surface, Bridge Removal, Rock Slope Protection, Minor Concrete, Misc. Iron & Steel, Adjust Utilities, Signs, Midwest Guardrail System, Concrete Barrier, Transition Railing, Alternative In-Line Terminal TL-3, Alternative Crash Cushion TL-3, Thermoplastic Pavement Marking & Striping, Electrical, Import Borrow, Grinding, Storm Drain, Welding Wire Wall and Trucking


PROJECT NAME:

Construction on State Highway in San Mateo County in Foster City and San Mateo on Route 92 from 0.2 Mile East of South Delaware Street Undercrossing to 0.3 Mile West of Vintage Park Overcrossing and on Route 101 from 0.3 Mile South of East Hillsdale Boulevard Overcrossing to 0.3 Mile North of Route 92 / 101 Separation

BID CONTRACT #:

Contract No. 04-2Q8004

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

San Mateo, HWY 92, CA

BID DUE DATE:

10-29-2024 at 02:00 PM

OUTREACH COORDINATOR:

Randy Bonino

TELEPHONE:

408-574-1400

FAX:

408-365-9548

ADDRESS:

5225 Hellyer Avenue, Suite 220, San Jose, CA, 95138

PROJECT DETAILS:

Granite Rock Company 'Graniterock' is signatory to Operating Engineers, Laborers, Teamsters, Carpenters and Cement Masons unions. 100% performance and payment bonds will be required from a qualified surety company for the full amount of the subcontract price. Bonding assistance is available. Graniterock will pay bond premium up to 1.5%. In addition to bonding assistance, subcontractors are encouraged to contact Graniterock Estimating with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Plans and specifications can be downloaded on-line with Caltrans, or at our offices, but please contact our estimating office for assistance.  Subcontractors must possess a current contractor's license, DIR number, insurance and worker's compensation coverage. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work category code(s) that apply to the scope of work they are quoting. Items of work can be broken down to facilitate DBE participation. Graniterock intends to work cooperatively with all qualified firms seeking work on this project. Granite Rock Company is an equal opportunity employer.

Social Media

Copyright © 2024 Compliance News All rights reserved.