is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Asphalt, Concrete, Structural Steel, Metal fabrication, Sanitary Sewer, Irrigation, Fencing and Handrails, Electrical/ Low voltage, Track Paving, Abatement, Building Demolition, Pavement Marking/Striping, Planting, Bleachers Specialty Building Trades, Signage, Flagpoles, Retaining Wall.
Chula Vista High School Stadium Modernization
24-2897-AM
Sweetwater Union High School District
820 4th Ave, Chula Vista CA 91911, Chula Vista, CA, 91911
10-11-2024 at 02:00 PM
Ethel Montano
619-278-8824
619-278-8761
8884 Jurupa Road, Jurupa Valley, CA, 92509
PROJECT DETAILS:
Ohno Construction invites your firm to submit a bid for the following project:
Sweetwater Union High School District
PROJECT DESCRIPTION:: New High School Stadium project including Home and Visitor Bleachers, Press Box, Ticket Booths, artificial turf sports field, 8 lane rubber surface track, Home and Visitor Concession Buildings, Field House Storage Building, Musco light poles, American with Disabilities Act (ADA) improvements, retaining walls, concrete paving, utilities, sitework, parking lot improvements, and landscaping.
LOCATION: 820 4TH Ave, Chula Vista CA 91911
ENGINEERS ESTIMATE: $31,800,000
WAGE: Project Labor Agreement (PLA)
SCHEDULE: 12/23/24- 7/8/26 (563 Calendar Days)
RFI DUE: 3 days before Bid Date
PREQUALIFICATION: Required for C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46, applications due October 1st 2024 - https://purchasing.sweetwaterschools.org/contractor-pre-qualification/
DVBE contractors encouraged
California Air Resources Board (CARB) compliance required, please submit certificate with quote.
Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.
BID DOCUMENTS: Bid documents are available for download from our website HERE: https://ohno.sharefile.com/home/shared/fodcdf71-0fa9-404f-b280-4802efab2b7b
Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.
*Any subcontractors who are interested in submitting a quote for this project please be advised to review any proof of Covid Vaccination requirements for on-site workers before turning in a bid. All specifications (including those relating to Covid) apply to all subcontractors and suppliers
*Asphalt subcontractors must agree to meet tolerances as mentioned in the drawings and in the specifications.
STANDARD REQUIREMENTS: By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.
BID RESPONSE:
Our firm will be providing a bid for this project: YES NO
PDF ATTACHMENTS: