is seeking certified and qualified DBE subcontractors and/or suppliers to provide The Project consists of removing and abandoning an existing sewer pump station and installing a new sewer pump station including all site improvements, electrical, and piping work required to tie the sewer pump station into the existing sewer system. The project will occur North of the Laramie St. and Highway 89 intersection, from the highway to the wastewater treatment plant. Temporary Sewer Bypass Pumping 01 54 00 Construction Activities Stormwater Best Management Practices 01 57 00 Stormwater Runoff Control Program 01 57 23 Pipe Removal ....................................................................................................................... 02 41 13 Manholes and Cleanouts ...................................................................................................... 03 39 00 Packaged Lift Station ............................................................................................................ 22 13 43 Electrical Work ...................................................................................................................... 26 05 00 Wires and Cables ................................................................................................................. 26 05 19 Grounding ............................................................................................................................. 26 05 26 Electrical Raceway Systems ................................................................................................. 26 05 33 Underground Raceway Systems .......................................................................................... 26 05 43 Wiring Devices ...................................................................................................................... 26 27 26 Standby Generator ............................................................................................................... 26 32 13 Lighting ................................................................................................................................. 26 56 00 Earthwork ............................................................................................................................. 31 00 00 Demolition, Clearing, Grubbing, Stripping ............................................................................. 31 11 00 Structure Excavation and Backfill .......................................................................................... 31 23 00 Dewatering ........................................................................................................................... 31 23 19 Trenching, Backfilling, and Compacting ................................................................................ 31 23 33 Sheeting, Waling, and Shoring ............................................................................................. 31 40 00 Vegetative Erosion Control ................................................................................................... 32 92 19 Cured-in-Place Pipe .............................................................................................................. 33 01 30 Piping Accessories and Appurtenances ............................................................................... 33 05 00 Testing of Gravity Sewer Lines and Manholes ...................................................................... 33 05 05 Plastic Pipe and Fittings ........................................................................................................ 33 05 11 Testing of Pipelines............................................................................................................... 33 31 00 Abandonment of Pipelines and Manholes ............................................................................ 33 39 13 Control Panel ........................................................................................................................ 40 67 16 Process Control and Instrumentation Systems ..................................................................... 40 70 00 Process Measurement Devices ............................................................................................ 40 91 01
Markleeville Public Utility District Sewer Pump Station Relocation Project
Not Available
Markleeville Public Utility District
99 Water Street, Markleeville, CA, 96120
11-06-2024 at 01:00 PM
Kathryn Knicely
5305414700
Not Available
1012 Industrial Ave Suite 2, South Lake Tahoe, CA, 96150
PROJECT DETAILS:
Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (If required).
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid.
All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available by contacting our estimating department
Full conformance with the project plans and specifications is required