Trade Journal

Edwards Construction Group

is seeking certified and qualified DVBE and SDVOSB subcontractors and/or suppliers to provide Demolition, Concrete, Polished Concrete Finishing, Structural Steel, Decorative Metal, Rough Carpentry, Casework and countertops, FRP Paneling, Crystalline Waterproofing, Thermal Insulation, Roofing, Sheet Metal Flashing and Trim, Doors, Frames, and Hardware, Access Doors and Panels, Rolling Counter Doors, Aluminum-Framed Storefront, Glass & Glazing, Gypsum Board, Plastering, Tiling, Acoustical and Linear Wood Ceilings, Resilient Flooring, Painting and Coating, Markerboards and Tackboards, Signage, Toilet Accessories, Cubicle Curtains and Track, Fire Protection Specialties, Metal Storage Shelving, Flagpoles, Roller Window Shades, Electric Traction Elevators, Fire Suppression, Plumbing, Heating, Ventilating, and Air Conditioning (HVAC), Commissioning of HVAC, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Electrical, Communications, Audio/Visual System, Electronic Safety and Security, Fire Alarm, Earthwork & Grading, Asphalt Paving, Synthetic Grass Surfacing, Chain Link Fences and Gates, Landscaping, Site Utilities


PROJECT NAME:

Castle Park High School - Building and Site Improvements

BID CONTRACT #:

25-2924-JG

AWARDING AGENCY:

Sweetwater Union High School District

PROJECT LOCATION:

1395 Hilltop Dr, Chula Vista, CA, 91911

BID DUE DATE:

10-22-2024 at 02:00 PM

OUTREACH COORDINATOR:

Maranda Maliska

TELEPHONE:

619-784-2704

FAX:

805-614-9909

ADDRESS:

4350 Executive Dr, Suite 205, San Diego, CA, 92121

PROJECT DETAILS:

Edwards Construction Group is currently pursuing the Castle Park High School - Building and Site Improvements project for Sweetwater Union High School District.

SCOPE OF WORK:

  • SITE MODERNIZATION OF AN EXISTING HIGH SCHOOL CAMPUS, WITH DEMOLITION OF SELECT BUILDINGS (BY CONTRACTOR) AND EXISTING SITE WORK.
  • CONSTRUCTION OF A TWO-STORY CLASSROOM BUILDING (900)
  • INSTALLATION OF HARDSCAPE, LANDSCAPE & ARTIFICIAL TURF, (5) PC-APPROVED SHADE STRUCTURES, PLATFORM, NEW WALKING RAMP TO THE RIGHT OF WAY, PV BATTERY STORAGE CABINET 

Est Construction Budget: $19,000,000

Please let us know if you are interested in bidding this project, and we will send you an invite via Procore.

This is a PREVAILING WAGE project.  

There is a 3% DVBE Participation requirement.

There is a MEP Subcontractor Prequalification requirement. Subcontractors holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses, if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered. The Prequalification application is available at the SUHSD Purchasing Website, under the Contractor Prequalification tab -AND- provided in Exhibit A of the bid documents attached. Contractor Pre-Qualification are due to Purchasing no less than 10 calendar days prior to bid opening: 10/09/2024 by 2:00 pm.

There is a PROJECT STABILIZATION AGREEMENT 

(http://www.sandiegounhttp://planningandconstruction.sweetwaterschools.org/suhsd-project-labor-agreement-eff-07-11-16/)

BID DATE -  Tuesday, October 22nd, 2:00PM PST

Please note that the listed due date and time is the time that all completed paperwork is due at the Bid Location. We request that all bids be sent to us no later than 10:00AM on the 22nd to be considered.  

Please call if you have any questions. 

 

Thank you,

Maranda Maliska

Estimating

Office: 619-493-3064

Fax:  805-614-9906

E-mail: EstimatingSD@edwardscongroup.com 

Social Media

Copyright © 2024 Compliance News All rights reserved.